DAY 1 - AM (BUILDING LAWS)

DAY 1 - AM (BUILDING LAWS)

Professional Development

200 Qs

quiz-placeholder

Similar activities

SocSci Major Diagnostic Test for LET March 2026

SocSci Major Diagnostic Test for LET March 2026

Professional Development

200 Qs

TWK 2

TWK 2

Professional Development

200 Qs

[K49] ĐỀ CƯƠNG - LẦN 3

[K49] ĐỀ CƯƠNG - LẦN 3

Professional Development

200 Qs

2 APK April 1997

2 APK April 1997

Professional Development

200 Qs

NQ123

NQ123

Professional Development

200 Qs

AGL Grocery++ - 2024

AGL Grocery++ - 2024

Professional Development

200 Qs

AGL Meat all - 2024

AGL Meat all - 2024

Professional Development

200 Qs

DAY 1 - AM (BUILDING LAWS)

DAY 1 - AM (BUILDING LAWS)

Assessment

Quiz

Professional Development

Professional Development

Practice Problem

Medium

Created by

REGGIE ALABA

Used 409+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

200 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

All private and public buildings, facilities and structures to be constructed, altered or modified, which by reason of their use, size and height are required to install any or combination of the following:

  1. Wet stand pipe
  2. Automatic fire suppression system
  3. Automatic fire detection and alarm system
  4. Smoke control system

1,2,4

1,2,3

1,3,4

All of the above

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The revised Implementing Rules and Regulations of the Comprehensive Fire Code of the Philippines was approved by the Secretary of the DILG on August 7, 2019 and take effect on.

October 15, 2019

October 17, 2009

October 17, 2019

December 19, 2019

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A building contractor was charge with illegally changing an existing street level office space to a restaurant that can accommodate dining seats for more than 50 people without the corresponding Certificate of Change of Use.

Light violation

Less grave violation

Gross Violation

Grave violation

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A written report to composed of plans, specifications and design analysis per building prepared by its Engineer/Architect-of Record and Fire Safety Practitioner

FSCR

FSCCR

FALAR

FSMR

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Walkway should be kept as level as possible and provided with slip resistant material. Whenever and wherever possible, walkway should have a gradient no more than?

3%

4%

5%

2%

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

NBCP, width and height of doors shall not be less than_____mm in width, and shall be not less than ______m in height, opening will be 90deg and exit way clear width shall not be less than 700mm.

800mm, 2.1m

900mm, 2.0m

800mm, 2.0m

900mm, 2.1m

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the minimum door way width under BP 344?

0.70m

0.80m

0.90m

1.00m

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?