Basic Civil Engineering

Basic Civil Engineering

Professional Development

17 Qs

quiz-placeholder

Similar activities

Статусы номеров, виды уборки

Статусы номеров, виды уборки

Professional Development

16 Qs

L2 Plumbing Common Plumbing Processes Knowledge Test

L2 Plumbing Common Plumbing Processes Knowledge Test

University - Professional Development

14 Qs

New product

New product

KG - Professional Development

15 Qs

What does DP stand for?

What does DP stand for?

Professional Development

15 Qs

SPAGHETTI!

SPAGHETTI!

Professional Development

20 Qs

YUM - Grill Master

YUM - Grill Master

Professional Development

20 Qs

Pantry Station

Pantry Station

Professional Development

20 Qs

Yum Burger

Yum Burger

Professional Development

20 Qs

Basic Civil Engineering

Basic Civil Engineering

Assessment

Quiz

Professional Development

Professional Development

Hard

Created by

Prashant Tripathi

Used 2K+ times

FREE Resource

17 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

In LAYOUT FINALISATION, which of the following is not the Secondary Details :-

Future expansion of switchyard should be easily possible

In seismic prone zones height of structures should be as low as possible.

Location and Orientation of Main Entry of Switchyard

The outgoing transmission line should not cross each other

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

For Field Test , Significant depth of Exploration For isolated fdn :

0.5 to 1 times the width

1.5 to 2 times the width

2.5 to 4 times the width

None

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

For Field Test , Significant depth of Exploration For Pile fdn :

1m to 5m

5m to 15m

20m to 35m

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

In reamed piles type of Deep Foundations :-

are constructed to a depth of 1 to 3m into the ground

are constructed to a depth of 3 to 8m into the ground

are constructed to a depth of 10 to 18m into the ground

None

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

In Friction piles type of Deep Foundations :-

Terminated at Lower depth

Terminated at Higher depth

Terminated at Average depth

None

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the MINIMUM REQUIREMENT of Contour survey extending outside the boundary wall on all sides :

up to at least 2 m

up to at least 5 m

up to at least 10 m

None

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Which of the following is not the type of Substation Structure :

Gantry Structure–DP / Lattice

Outgoing Feeder–RSJ Pole (DP)

Road / River Crossing RSJ / Tubular / Lattice

Equipment Support Structure –DP / Lattice

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?