Basic Civil Engineering

Basic Civil Engineering

Professional Development

17 Qs

quiz-placeholder

Similar activities

contract law 3-elements

contract law 3-elements

Professional Development

20 Qs

Presentation, Analysis & Interpretation of Data

Presentation, Analysis & Interpretation of Data

University - Professional Development

15 Qs

Emerging Tech

Emerging Tech

Professional Development

15 Qs

Jolly Crispy Fries

Jolly Crispy Fries

Professional Development

15 Qs

NOVA MNT - KBC

NOVA MNT - KBC

Professional Development

12 Qs

BJT - BASICS

BJT - BASICS

Professional Development

15 Qs

Collocation

Collocation

Professional Development

18 Qs

Maslow's theory test

Maslow's theory test

Professional Development

12 Qs

Basic Civil Engineering

Basic Civil Engineering

Assessment

Quiz

Professional Development

Professional Development

Hard

Created by

Prashant Tripathi

Used 2K+ times

FREE Resource

17 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

In LAYOUT FINALISATION, which of the following is not the Secondary Details :-

Future expansion of switchyard should be easily possible

In seismic prone zones height of structures should be as low as possible.

Location and Orientation of Main Entry of Switchyard

The outgoing transmission line should not cross each other

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

For Field Test , Significant depth of Exploration For isolated fdn :

0.5 to 1 times the width

1.5 to 2 times the width

2.5 to 4 times the width

None

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

For Field Test , Significant depth of Exploration For Pile fdn :

1m to 5m

5m to 15m

20m to 35m

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

In reamed piles type of Deep Foundations :-

are constructed to a depth of 1 to 3m into the ground

are constructed to a depth of 3 to 8m into the ground

are constructed to a depth of 10 to 18m into the ground

None

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

In Friction piles type of Deep Foundations :-

Terminated at Lower depth

Terminated at Higher depth

Terminated at Average depth

None

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the MINIMUM REQUIREMENT of Contour survey extending outside the boundary wall on all sides :

up to at least 2 m

up to at least 5 m

up to at least 10 m

None

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Which of the following is not the type of Substation Structure :

Gantry Structure–DP / Lattice

Outgoing Feeder–RSJ Pole (DP)

Road / River Crossing RSJ / Tubular / Lattice

Equipment Support Structure –DP / Lattice

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?