
#3 EPA 608 Type III
Quiz
•
Other
•
11th Grade - Professional Development
•
Practice Problem
•
Medium
Mike Conway
Used 420+ times
FREE Resource
Enhance your content in a minute
25 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Who is responsible for keeping records of all leak inspections and any completed leak repair verification tests?
The original installing technician's employers
Only the technician that has actually performed each inspection or verification test
The owner and/or operator of the equipment
The EPA leak rate assessment division
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What steps may be taken to prevent air accumulation into an idle low-pressure refrigeration system?
Leave the purge unit on-line at all times.
Maintain system pressure slightly above atmospheric pressure.
Open the air vents on the condenser.
Intermittently operate the system with no load.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Generally, chillers belong to which EPA leak repair category?
Commercial refrigeration
Industrial process refrigeration
Comfort cooling
Ice making refrigeration
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A chiller containing 150 pounds of HCFC refrigerant is leaking above the leak rate threshold. Unless granted additional time, what must be completed within 30 days?
Repair the appliance so that it leaks below the threshold and conduct the initial verification test
Retrofit the appliance to a different natural refrigerant approved by ASHRAE.
Document that all OEM replacement parts have been ordered.
Notify the EPA of the leak rate and the time required to complete the repair.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Where does the purge unit on a centrifugal system take its suction?
Top of the condenser
Compressor oil sump
Top of the evaporator
Suction elbow
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
1. What must be done after recovering the liquid refrigerant from a low-pressure chiller?
Recover the vapor refrigerant.
Pressurize the system with nitrogen.
Separate the oil from the system.
Solvent flush the entire system.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What should be done to reduce refrigerant loss from a purge unit on a R-123 chiller?
Leak test and repair the chiller.
Seal the purge unit discharge line.
Pipe purge unit back into the low side.
Pipe purge unit back into recovery unit.
Create a free account and access millions of resources
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?
Similar Resources on Wayground
0 questions
OSHA/EPA/CDC
Quiz
•
0 questions
Chapter 3: Sections 3.1 & 3.2
Quiz
•
0 questions
Ag Apps: Environmental Science
Quiz
•
0 questions
Responsibilities of a Business Quiz
Quiz
•
0 questions
Chapter 6 Essential Marketing Quiz
Quiz
•
0 questions
EPA Section 608 Preparatory Manual Review 1
Quiz
•
0 questions
Midterm Review 2
Quiz
•
Popular Resources on Wayground
5 questions
This is not a...winter edition (Drawing game)
Quiz
•
1st - 5th Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
10 questions
Identify Iconic Christmas Movie Scenes
Interactive video
•
6th - 10th Grade
20 questions
Christmas Trivia
Quiz
•
6th - 8th Grade
18 questions
Kids Christmas Trivia
Quiz
•
KG - 5th Grade
11 questions
How well do you know your Christmas Characters?
Lesson
•
3rd Grade
14 questions
Christmas Trivia
Quiz
•
5th Grade
20 questions
How the Grinch Stole Christmas
Quiz
•
5th Grade
Discover more resources for Other
26 questions
Christmas Movie Trivia
Lesson
•
8th Grade - Professio...
15 questions
Christmas Song Emoji Pictionary
Quiz
•
7th - 12th Grade
20 questions
Christmas Movies
Quiz
•
1st - 12th Grade
55 questions
CHS Holiday Trivia
Quiz
•
12th Grade
20 questions
Christmas Movie Trivia
Quiz
•
9th - 12th Grade
29 questions
christmas facts
Lesson
•
5th - 12th Grade
25 questions
Christmas Movies
Quiz
•
Professional Development
20 questions
Christmas Trivia
Quiz
•
5th - 12th Grade
