
#3 EPA 608 Type III

Quiz
•
Other
•
11th Grade - Professional Development
•
Medium
Mike Conway
Used 391+ times
FREE Resource
25 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Who is responsible for keeping records of all leak inspections and any completed leak repair verification tests?
The original installing technician's employers
Only the technician that has actually performed each inspection or verification test
The owner and/or operator of the equipment
The EPA leak rate assessment division
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What steps may be taken to prevent air accumulation into an idle low-pressure refrigeration system?
Leave the purge unit on-line at all times.
Maintain system pressure slightly above atmospheric pressure.
Open the air vents on the condenser.
Intermittently operate the system with no load.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Generally, chillers belong to which EPA leak repair category?
Commercial refrigeration
Industrial process refrigeration
Comfort cooling
Ice making refrigeration
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A chiller containing 150 pounds of HCFC refrigerant is leaking above the leak rate threshold. Unless granted additional time, what must be completed within 30 days?
Repair the appliance so that it leaks below the threshold and conduct the initial verification test
Retrofit the appliance to a different natural refrigerant approved by ASHRAE.
Document that all OEM replacement parts have been ordered.
Notify the EPA of the leak rate and the time required to complete the repair.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Where does the purge unit on a centrifugal system take its suction?
Top of the condenser
Compressor oil sump
Top of the evaporator
Suction elbow
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
1. What must be done after recovering the liquid refrigerant from a low-pressure chiller?
Recover the vapor refrigerant.
Pressurize the system with nitrogen.
Separate the oil from the system.
Solvent flush the entire system.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What should be done to reduce refrigerant loss from a purge unit on a R-123 chiller?
Leak test and repair the chiller.
Seal the purge unit discharge line.
Pipe purge unit back into the low side.
Pipe purge unit back into recovery unit.
Create a free account and access millions of resources
Similar Resources on Wayground
20 questions
SISTEM AC KENDARAAN

Quiz
•
11th Grade
20 questions
Introduction to Vehicle Maintenance

Quiz
•
9th - 12th Grade
21 questions
Automotive Air Conditioning Principals

Quiz
•
12th Grade
20 questions
HAC-101 Chap 59 HVAC System Diagnostic (Diesel) Test A

Quiz
•
University
27 questions
EPA 608 - TYPE 1

Quiz
•
9th - 12th Grade
20 questions
HAC-101 Chap 58 Principles of HVAC Test A

Quiz
•
University
25 questions
#1 EPA 608 Type III

Quiz
•
11th Grade - Professi...
20 questions
WCS 1107-3 - Knowledge Assessment

Quiz
•
Professional Development
Popular Resources on Wayground
55 questions
CHS Student Handbook 25-26

Quiz
•
9th Grade
10 questions
Afterschool Activities & Sports

Quiz
•
6th - 8th Grade
15 questions
PRIDE

Quiz
•
6th - 8th Grade
15 questions
Cool Tool:Chromebook

Quiz
•
6th - 8th Grade
10 questions
Lab Safety Procedures and Guidelines

Interactive video
•
6th - 10th Grade
10 questions
Nouns, nouns, nouns

Quiz
•
3rd Grade
20 questions
Bullying

Quiz
•
7th Grade
18 questions
7SS - 30a - Budgeting

Quiz
•
6th - 8th Grade
Discover more resources for Other
11 questions
All about me

Quiz
•
Professional Development
20 questions
Lab Safety and Lab Equipment

Quiz
•
9th - 12th Grade
20 questions
ROAR Week 2025

Quiz
•
9th - 12th Grade
10 questions
How to Email your Teacher

Quiz
•
Professional Development
20 questions
Getting to know YOU icebreaker activity!

Quiz
•
6th - 12th Grade
37 questions
SJHS Key Student Policies

Quiz
•
11th Grade
12 questions
Macromolecules

Lesson
•
9th - 12th Grade
13 questions
Cell Phone Free Act

Quiz
•
9th - 12th Grade