TechMD-IEC Module 1 Quiz

TechMD-IEC Module 1 Quiz

Professional Development

20 Qs

quiz-placeholder

Similar activities

H&S T-level Quiz

H&S T-level Quiz

Professional Development

17 Qs

HSE QUIZ Q2 2023

HSE QUIZ Q2 2023

Professional Development

15 Qs

Introduction to Transmission Lines

Introduction to Transmission Lines

Professional Development

20 Qs

Godzilla

Godzilla

4th Grade - Professional Development

15 Qs

Unit 102 Revision #1

Unit 102 Revision #1

Professional Development

15 Qs

Personal Protective Equipment.

Personal Protective Equipment.

Professional Development

20 Qs

Painting and Decorating L1 - RECAP

Painting and Decorating L1 - RECAP

Professional Development

15 Qs

ECM744 - Construction Site Safety

ECM744 - Construction Site Safety

Professional Development

15 Qs

TechMD-IEC Module 1 Quiz

TechMD-IEC Module 1 Quiz

Assessment

Quiz

Other

Professional Development

Medium

Created by

Phoebe Adriano

Used 22+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Alert Bulletin No. 5 is all about?

No Clearance, No Work Policy

PCB Switching Protocol During Emergency Condition

The DOs and DON’Ts of Switching Operation of Power Circuit Breakers

Information, Education and Communication

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What study/analysis is necessary to determine the PPE class to be used in operating or conducting maintenance on electrical equipment?

Short Circuit Analysis

System Analysis

Arc Flash (AF) analysis

None of the above

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is TechMD's IEC ?

International Electrotechnical Commission

Integral Evaluation Comments

Information, Evaluation and Correction

Information, Education and Communication

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is SOTF?

Switch On To Fault

Switch off to fault

Sequence on to Fault

None of the above

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who is the authorized person to give clearance to non-NGCP personnel that will be working on 230/138kV  substation/installation?

Vice President, FG

Regional Head/ AVP Region

District Head

Substation Manager

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When should the pre-maintenance meeting be conducted for non-MP related activities?

at least 5 days before the activity

at least 7 days before the activity

at least 2 days before the activity

at least 1 day before the activity

7.

FILL IN THE BLANK QUESTION

30 sec • 1 pt

True or False. During emergency conditions, the SEOD can de energize the 69 kV lines with transmission function  and/or with connected generators

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?