Search Header Logo

#6 EPA 608 Type II

Authored by Mike Conway

Other

11th Grade - Professional Development

Used 456+ times

#6 EPA 608 Type II
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

25 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A comfort-cooling appliance containing 50 pounds or more of R-22 is found to be leaking beyond the applicable leak rate threshold. Unless granted additional time, how many days do you have to repair the leak and conduct the initial leak verification test?

1 days

10 days

30 days

45 days

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

After a leak repair of a supermarket rack using 3000 lbs of R-22 and a successful initial verification test, when must a follow-up leak verification test be conducted?

The same day.

The next day.

Within 10 days.

Within 30 days.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Before making a major repair, technicians must evacuate an appliance or component containing more than 200 pounds of R-410A to which of the following levels?

0 psig

25 mm Hg absolute

10 inches of Hg vacuum

15 inches of Hg vacuum

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During evacuation with large amounts of moisture it may be necessary to increase pressure to counteract freezing with gas such as;

R-410A.

R-22.

Air.

Nitrogen.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How would you remove moisture from refrigerant in a system?

Purge the condenser.

Drain the oil separator.

Reduce water flow to the condenser.

Use a filter drier.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Refrigerant has been recovered from an air-conditioning system and held in a refillable cylinder, in order to replace the condenser coil. The refrigerant;

may be charged back into the system.

may be sold as is to another equipment owner.

must be reclaimed.

must be destroyed.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To determine if the system is leaking more than the allowable rate, the EPA allows the use of which one of the following methods to determine the full charge?

Use of the calculations based on power consumption, in kWh.

Use of the calculations based on compressor horsepower

Use of calculations based on component and pipe sizes.

Use of the calculations based on the BTU capacity of the system.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?