Carp 2 27109 Intro to Building Envelope System  (EQ's 15)

Carp 2 27109 Intro to Building Envelope System (EQ's 15)

9th - 12th Grade

15 Qs

quiz-placeholder

Similar activities

Carp. II Intro to Bldg. Envelope Systems 1-15

Carp. II Intro to Bldg. Envelope Systems 1-15

Building Envelope System

Building Envelope System

House wrap

House wrap

Envelope system

Envelope system

Carpentry test

Carpentry test

Carpentry II -  Exterior Finishing

Carpentry II - Exterior Finishing

Session Eleven Quiz

Session Eleven Quiz

Carp 2 27109 Intro to Building Envelope System  (EQ's 15)

Carp 2 27109 Intro to Building Envelope System (EQ's 15)

Assessment

Quiz

Life Skills

9th - 12th Grade

Easy

Created by

Christopher Foy

Used 35+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Installing windows and exterior doors in a house is the final step in _____. 1.1.0

finishing

thermal-protection

drying-in

envelope sealing

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

for maximum energy efficiency in a structure, air infiltration is controlled by properly applying and sealing ______, 1.1.0

building paper

polypropylene film

rigid insulation

building wrap

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When installing building wrap on a structure, all overlaps should be _____. 1.1.0

3" to 6"

6" to 12"

12" to 18"

18" to 24"

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To meet IRC requirements, the maximum sill height above the floor of an egress window is _____. 1.2.0

36"

40"

44"

48"

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Nailing flanges are not found on the outside of _____. 2.0.0

wood windows

metal windows

vinyl-clad wood windows

vinyl windows

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When checking a window opening for squareness, you would use a _____. 2.0.0

combination square

plumb bob

framing square

laser level

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To allow for settling, the space allowed between the rough header and window head jamb should be _____. 2.0.0

1/8" to 1/4"

1/4" to 1/2"

5/16" to 5/8"

5/8" to 3/4"

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?