Carp 1 27111 Wall Systems  (RQ's, 15-30) II

Carp 1 27111 Wall Systems (RQ's, 15-30) II

9th - 12th Grade

15 Qs

quiz-placeholder

Similar activities

Carpentry Materials and Consumables Quiz

Carpentry Materials and Consumables Quiz

10th Grade

10 Qs

Cardiovascular Medical Terminology Quiz

Cardiovascular Medical Terminology Quiz

12th Grade

18 Qs

GROOMING STANDAR

GROOMING STANDAR

1st - 12th Grade

10 Qs

Wall Coverings and Lighting Quiz Review

Wall Coverings and Lighting Quiz Review

9th - 12th Grade

20 Qs

Muscular System Review

Muscular System Review

9th - 12th Grade

20 Qs

Safety in CCE

Safety in CCE

11th - 12th Grade

10 Qs

Dog Breed Basics

Dog Breed Basics

10th Grade

12 Qs

servesafe manager chapter 9

servesafe manager chapter 9

12th Grade

14 Qs

Carp 1 27111 Wall Systems  (RQ's, 15-30) II

Carp 1 27111 Wall Systems (RQ's, 15-30) II

Assessment

Quiz

Life Skills

9th - 12th Grade

Medium

Created by

Christopher Foy

Used 55+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Door and window schedules can be found in the ____________. 2.2

legend

architectural drawings

details of the structural drawings

manufacturer's directions

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The length of a cripple stud above a window opening equals the length of a common stud less the height of the trimmer, combined with the thickness of the __________. 3.0

soleplate

rough sill

top plate

header

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When calculating the length of a common stud for a wood frame floor, do not consider the thickness of the _________. 3.0

soleplate

subfloor

underlayment

double top plate

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The preferred method of framing a wall is to ________________. 3.1

nail down the soleplate and built it in place

assemble it on the ground

lay out and assemble it on the subfloor

have it built off-site

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Pieces of 2 x 4 placed horizontally between each pair of studs are used to ___________. 3.2

brace the frame

retard the spread of fire

provide nailers for siding

when installing ceiling joists

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To prevent a wall section from sliding as it is being raised, you should install __________. 3.3

cleats

hold-down clamps

retainers

anchor bolts

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A long 2 x 4 with a 3/4" standoff block nailed to each end is used as a ________________ 3.3.1

wall-brace

straightedge

gauge block

trimmer stud

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?