CIVIL ENGINEERING MAINTENANCE

CIVIL ENGINEERING MAINTENANCE

University

25 Qs

quiz-placeholder

Similar activities

Ultimate office trivia quiz

Ultimate office trivia quiz

KG - Professional Development

25 Qs

Consumer Behavior

Consumer Behavior

University

20 Qs

EMBEDDED SYSTEM DESIGN

EMBEDDED SYSTEM DESIGN

University

20 Qs

BEEE Pre-test Assessment

BEEE Pre-test Assessment

University

20 Qs

Principal of marketing chapter 2

Principal of marketing chapter 2

University

20 Qs

Artificial Potential Field Method & Roadmaps

Artificial Potential Field Method & Roadmaps

University

20 Qs

T1B3 ACTIVITY: Modules 1 to 3

T1B3 ACTIVITY: Modules 1 to 3

University

20 Qs

Dasar Fotografi

Dasar Fotografi

University

20 Qs

CIVIL ENGINEERING MAINTENANCE

CIVIL ENGINEERING MAINTENANCE

Assessment

Quiz

Other

University

Practice Problem

Hard

Created by

CIVIL ASSIGNMENT

Used 45+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

25 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The placing of new Foundation below and existing foundation of the process of strengthening the existing Foundation is known as the ___________ of foundation.

Shoring

Underpinning

Grouting

Scaffolding

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

In _____ method of underpinning, the existing wall is divided into suitable sections of width about 1.20 metre to 1.50 metre.

Chemical Method

Pile Method

Miscellaneous Method

Pit Method

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

In ____ method, the piles are driven along both the sides of existing wall and the needle in the form of pile caps are provided through the existing one.

Miscellaneous method

Vibroflotation

Pit method

Pile method

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

When one building is higher than the other, _________ may be provided on the horizontal shores.

Pit Underpinning

Flying shore

Pile Underpinning

Raking shore

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

A large factor of safety should be adopted in the design of _____ as it is difficult to assess the actual loads.

Pile method

Horizontal shore

Pit method

Vertical shores

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The following is not a classification of maintenance

Preventive maintenance

Scheduled maintenance

Timely maintenance

Corrective maintenance

7.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Belt of an electric motor is broken, it needs

Corrective maintenance

Scheduled maintenance

Preventive maintenance

Timely maintenance

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?