CIVIL ENGINEERING MAINTENANCE

CIVIL ENGINEERING MAINTENANCE

University

25 Qs

quiz-placeholder

Similar activities

Chiller Plant Monitoring

Chiller Plant Monitoring

University

20 Qs

National 5 Bus Mgt Ops Methods of Production

National 5 Bus Mgt Ops Methods of Production

KG - University

20 Qs

Housekeeping Operation Skill: Quiz 1

Housekeeping Operation Skill: Quiz 1

University

25 Qs

Java programming

Java programming

University

20 Qs

Chapter 8: Evidence-Based Strategies for Maintenance.....

Chapter 8: Evidence-Based Strategies for Maintenance.....

University

20 Qs

QUIZ FM BPE35003 #SEC2

QUIZ FM BPE35003 #SEC2

University

22 Qs

BES 2 Midterm Exam Objective Type

BES 2 Midterm Exam Objective Type

University

27 Qs

ITE 2- WEEK 9

ITE 2- WEEK 9

University

20 Qs

CIVIL ENGINEERING MAINTENANCE

CIVIL ENGINEERING MAINTENANCE

Assessment

Quiz

Other

University

Hard

Created by

CIVIL ASSIGNMENT

Used 45+ times

FREE Resource

25 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The placing of new Foundation below and existing foundation of the process of strengthening the existing Foundation is known as the ___________ of foundation.

Shoring

Underpinning

Grouting

Scaffolding

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

In _____ method of underpinning, the existing wall is divided into suitable sections of width about 1.20 metre to 1.50 metre.

Chemical Method

Pile Method

Miscellaneous Method

Pit Method

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

In ____ method, the piles are driven along both the sides of existing wall and the needle in the form of pile caps are provided through the existing one.

Miscellaneous method

Vibroflotation

Pit method

Pile method

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

When one building is higher than the other, _________ may be provided on the horizontal shores.

Pit Underpinning

Flying shore

Pile Underpinning

Raking shore

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

A large factor of safety should be adopted in the design of _____ as it is difficult to assess the actual loads.

Pile method

Horizontal shore

Pit method

Vertical shores

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The following is not a classification of maintenance

Preventive maintenance

Scheduled maintenance

Timely maintenance

Corrective maintenance

7.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Belt of an electric motor is broken, it needs

Corrective maintenance

Scheduled maintenance

Preventive maintenance

Timely maintenance

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?