QUIZ 2-L4:C03 (SYSTEM INSTALLATION & COMMISSIONING)

QUIZ 2-L4:C03 (SYSTEM INSTALLATION & COMMISSIONING)

4th Grade

12 Qs

quiz-placeholder

Similar activities

REVISION FOOD STORAGE

REVISION FOOD STORAGE

1st - 6th Grade

10 Qs

Garment Production

Garment Production

1st - 4th Grade

10 Qs

Xometry: are you a packaging hero?

Xometry: are you a packaging hero?

1st - 5th Grade

9 Qs

Packing & Labeling (2)

Packing & Labeling (2)

1st - 8th Grade

9 Qs

Air Export Quiz

Air Export Quiz

KG - Professional Development

17 Qs

Small Scale Business

Small Scale Business

4th - 6th Grade

10 Qs

SPLC1 - Opinion Polls

SPLC1 - Opinion Polls

KG - Professional Development

9 Qs

GESTION DE ALMACENAMIENTO

GESTION DE ALMACENAMIENTO

1st - 5th Grade

10 Qs

QUIZ 2-L4:C03 (SYSTEM INSTALLATION & COMMISSIONING)

QUIZ 2-L4:C03 (SYSTEM INSTALLATION & COMMISSIONING)

Assessment

Quiz

Professional Development

4th Grade

Hard

Created by

siti yasmin

Used 12+ times

FREE Resource

12 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

All stated below are important aspects of equipment delivery EXCEPT...

Full equipment information

Packing safety.

Follow-up on delivery

Installation approval permit.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Serial number and delivery date include in safety precaution for packing.

True

False

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Total protection, duration of cover,type and value.


What is the meaning of listed criteria in equipment delivery?

Insurance

Delivery documents

Packing safety

Full equipment information

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the method can be use for follow-up on shipping?

sending fax

on site installation

access the route

exchange and placement

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Compliance with packaging conditions, Precautions when removing the machine from the package, Complete the transportation to location, Equipment installation, Verification before on the electric power .


What is the meaning of items above?

Full equipment information

Insurance coverage

Supervise the final installation

Delivery documents

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why the inspection of the packaging material must be carried out?

To find position of utility

To arrange the assembly team

To use skilled workers to dismantle

To find if damage of the packaging box.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Use proper equipment to lift box, use the right rope like chain, box is placed on stable ground and use skilled workers to dismantle.


The statement above mention about precautions when remove machine from packaging.

True

False

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?