QUIZ 2-L4:C03 (SYSTEM INSTALLATION & COMMISSIONING)

QUIZ 2-L4:C03 (SYSTEM INSTALLATION & COMMISSIONING)

4th Grade

12 Qs

quiz-placeholder

Similar activities

Recuperación Abril

Recuperación Abril

1st Grade - Professional Development

10 Qs

BUSINESS ANALYSIS CLASS

BUSINESS ANALYSIS CLASS

KG - Professional Development

16 Qs

QUIZ 1- L4: C03 (SYSTEM INSTALLATION & COMMISSIONING)

QUIZ 1- L4: C03 (SYSTEM INSTALLATION & COMMISSIONING)

4th Grade

12 Qs

la tagliatella

la tagliatella

1st - 10th Grade

8 Qs

Basic Mentality

Basic Mentality

1st - 4th Grade

10 Qs

Forum CIP RU VII Kasim

Forum CIP RU VII Kasim

1st - 5th Grade

10 Qs

Lost and Breakages 2021

Lost and Breakages 2021

4th Grade

10 Qs

qui fait quoi!!

qui fait quoi!!

1st - 12th Grade

11 Qs

QUIZ 2-L4:C03 (SYSTEM INSTALLATION & COMMISSIONING)

QUIZ 2-L4:C03 (SYSTEM INSTALLATION & COMMISSIONING)

Assessment

Quiz

Professional Development

4th Grade

Hard

Created by

siti yasmin

Used 12+ times

FREE Resource

12 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

All stated below are important aspects of equipment delivery EXCEPT...

Full equipment information

Packing safety.

Follow-up on delivery

Installation approval permit.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Serial number and delivery date include in safety precaution for packing.

True

False

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Total protection, duration of cover,type and value.


What is the meaning of listed criteria in equipment delivery?

Insurance

Delivery documents

Packing safety

Full equipment information

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the method can be use for follow-up on shipping?

sending fax

on site installation

access the route

exchange and placement

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Compliance with packaging conditions, Precautions when removing the machine from the package, Complete the transportation to location, Equipment installation, Verification before on the electric power .


What is the meaning of items above?

Full equipment information

Insurance coverage

Supervise the final installation

Delivery documents

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why the inspection of the packaging material must be carried out?

To find position of utility

To arrange the assembly team

To use skilled workers to dismantle

To find if damage of the packaging box.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Use proper equipment to lift box, use the right rope like chain, box is placed on stable ground and use skilled workers to dismantle.


The statement above mention about precautions when remove machine from packaging.

True

False

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?