Construction Safety_2

Construction Safety_2

Professional Development

10 Qs

quiz-placeholder

Similar activities

2020 PMA - Wells & PD&T HSE Conversation

2020 PMA - Wells & PD&T HSE Conversation

KG - Professional Development

10 Qs

9. Special Precautions for Track Maintenance in Electrified Area

9. Special Precautions for Track Maintenance in Electrified Area

Professional Development

15 Qs

TPVI Opscom

TPVI Opscom

Professional Development

15 Qs

GO & Travel Docs

GO & Travel Docs

Professional Development

10 Qs

quizz K3

quizz K3

Professional Development

10 Qs

QUIZIZZ CERMAT K3 - BULAN K3 2020 TARAKAN - BABAK 2

QUIZIZZ CERMAT K3 - BULAN K3 2020 TARAKAN - BABAK 2

Professional Development

15 Qs

iBPLS

iBPLS

Professional Development

10 Qs

18th edition part 1 mock 3

18th edition part 1 mock 3

Professional Development

10 Qs

Construction Safety_2

Construction Safety_2

Assessment

Quiz

Other

Professional Development

Hard

Created by

parag agarkar

Used 68+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Safety is the responsibility of every employee. But who is ultimately responsible for the implementation of safety requirements?

Safety Manager

Project Manager

Line management

Senior Management

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which of the following are considered as Safety Trainings?

Safety Orientation

Work at Height

Daily Toolbox Talk

First Aid Training

All of the above

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

In BASF projects, what is the moral and legal requirement contractor need to follow?

PTW (Permit to Work)

PPE

Disciplinary Action

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is the time limit to report Incidents which don’t fall under category of Rapid Incident Reporting?

12 Hours

48 Hours

24 Hours

8 Hours

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is the rating and action time of the electric current of the leakage protection / grounding device?

Must be < 30mA and action time must be > 0.1s

Shall not be > 30mA and the action time must be < 0.1s

Shall not be < 63mA and the action time > 0.1 s

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What should be the minimum height of overhead temporary power cables?

Shall not be installed lower than 2.5 M

Shall not be installed more than 2.5 M

Shall be installed below 1.8 M

To be routed 4.5 M and above

7.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Who should conduct Last Minute Risk Assessment?

Permit Approver

Permit Issuer

Task Supervisor

All above

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?