PT716A_Day2_Gourab Kolay_108_Pilot Plant Scale Up Technique

PT716A_Day2_Gourab Kolay_108_Pilot Plant Scale Up Technique

University - Professional Development

10 Qs

quiz-placeholder

Similar activities

Corporate Reporting 2

Corporate Reporting 2

University

12 Qs

Weighing Systems

Weighing Systems

Professional Development

10 Qs

TPM

TPM

Professional Development

7 Qs

SHIP'S PARTICULARS

SHIP'S PARTICULARS

Professional Development

10 Qs

Setting out rod

Setting out rod

Professional Development

10 Qs

Plant Reliability & Integrity Process

Plant Reliability & Integrity Process

Professional Development

10 Qs

The S.T.R.E.E.T Process Quiz

The S.T.R.E.E.T Process Quiz

Professional Development

6 Qs

PRESS TOOL TECHNOLOGY 02

PRESS TOOL TECHNOLOGY 02

University

10 Qs

PT716A_Day2_Gourab Kolay_108_Pilot Plant Scale Up Technique

PT716A_Day2_Gourab Kolay_108_Pilot Plant Scale Up Technique

Assessment

Quiz

Professional Development

University - Professional Development

Hard

Created by

Gourab Kolay

FREE Resource

10 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

which of the following areas are fall under the 'space requirement' in pilot plant scale up techniques?

Administration and Information processing Area

Physical Testing Area

Standard Equipment Floor Space

Storage Area

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Same areas should provided for the storage of the in-process materials, finished bulk products from the pilot-plant & materials from the experimental scale-up batches made in the production.

True

False

3.

FILL IN THE BLANK QUESTION

45 sec • 1 pt

purpose/responsibility of the pilot-plant is _____________________.

4.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

which of the following statements is/are false about equipment?

The most economical and the simplest & efficient equipment which are capable of producing product within the proposed specifications are used

The size of the equipment should be such that the experimental trials run should be relevant to the production sized batches

If the equipment is too small the process developed will scale up.

if equipment is too big then the wastage of the expensive active ingredients occurs.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to Pilot Plant scale Up Technique, what Is/are the following aspect of Master Manufacturing Procedures?

Weight Sheet

Processing Direction

Manufacturing Procedures

All of the above option are the aspects

6.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

which are the following factors that should be examined during the Process Evaluation Studies under Pilot Plant Scale Up Techniques?

Mixing Speed and Time

Rate of addition of granulating agents and solvents

heating and cooling rates,filter sizes,screen sizes

drying temperature,drying time

7.

FILL IN THE BLANK QUESTION

30 sec • 1 pt

each pilot batch representing the final formulation and manufacturing procedure should be studied for______________.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?