Lean Quiz 1

Lean Quiz 1

University

42 Qs

quiz-placeholder

Similar activities

Material Management

Material Management

University

40 Qs

KLL-PT : lab equipment invitro

KLL-PT : lab equipment invitro

University

47 Qs

Pagsusulit sa Araling Panlipunan 5

Pagsusulit sa Araling Panlipunan 5

5th Grade - University

41 Qs

Mandarin Middle Test 2020-2021

Mandarin Middle Test 2020-2021

University

41 Qs

ಕ್ವಿಜ್ ಸರಣಿ 82: ಡಾ|| ಬಿ. ಆರ್ ಅಂಬೇಡ್ಕರ್ ಜಯಂತಿ ವಿಶೇಷ ಕಾರ್ಯಕ್ರಮ

ಕ್ವಿಜ್ ಸರಣಿ 82: ಡಾ|| ಬಿ. ಆರ್ ಅಂಬೇಡ್ಕರ್ ಜಯಂತಿ ವಿಶೇಷ ಕಾರ್ಯಕ್ರಮ

University

41 Qs

Beyblade Metal Series

Beyblade Metal Series

1st Grade - Professional Development

39 Qs

Aptitude Test - 5 (26 jun 2021)

Aptitude Test - 5 (26 jun 2021)

University

45 Qs

candy

candy

4th Grade - Professional Development

40 Qs

Lean Quiz 1

Lean Quiz 1

Assessment

Quiz

Other

University

Practice Problem

Medium

Created by

thomas muhammad

Used 40+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

42 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Which of the following statements combine to form a valid definition of lean manufacturing? Lean manufacturing…

is a rigidly defined set of steps to follow.

focuses on reducing waste.

is a set of tools and philosophies.

focuses on automation of production.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The Seven Wastes are all examples of:

Overburden (muri)

Inconsistency (mura)

Wasted work (muda)

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An example of the implementation of a sequence poka-yoke method is:

A pre-counted back of screws

A warning sign placed on a door

A warning light that shines when a mistake is made

An activation switch that cannot be pressed until a safety door is closed

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The takt time is calculated as:

Minutes per shift x Shifts per day / Units required per day

Minutes per shift x Shifts per day x Units required per day

Minutes per shift / (Shifts per day x Units required per day)

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is lean used for

To Reduce the head count in the organization

To have Only Min resource(s) in the team

To Maximize Customer value while removing waste

To increase Organization Profit

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many principles are there in Lean

5

4

6

7

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does TPS stand for?

Total Production Streamlining
Toyota Production System
Taguchi's Production S's
Total Process Simplification
Transparent Processing System

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?