SAR 9.03.20

SAR 9.03.20

Professional Development

10 Qs

quiz-placeholder

Similar activities

Creativity in Classroom Teaching

Creativity in Classroom Teaching

Professional Development

13 Qs

TalentNext Test Day-13-Core Java Topics

TalentNext Test Day-13-Core Java Topics

Professional Development

10 Qs

Operate Scissor Lift

Operate Scissor Lift

Professional Development

10 Qs

INTRODUÇÃO AOS PROCESSOS DE SOLDAGEM

INTRODUÇÃO AOS PROCESSOS DE SOLDAGEM

Professional Development

10 Qs

IBEX A-ISB

IBEX A-ISB

Professional Development

10 Qs

MS402 - Platoon Leadership

MS402 - Platoon Leadership

Professional Development

11 Qs

Social Media & Education

Social Media & Education

Professional Development

10 Qs

PKN dan IPS PPPK

PKN dan IPS PPPK

Professional Development

10 Qs

SAR 9.03.20

SAR 9.03.20

Assessment

Quiz

Professional Development

Professional Development

Hard

Created by

Steve Tjelde

Used 3+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

FILL IN THE BLANK QUESTION

2 mins • 1 pt

What references are listed for SAR 9.03.20

2.

FILL IN THE BLANK QUESTION

1 min • 1 pt

Sprinkler protection shall be provided in elevator shafts with elevators using combustible suspension means (belts) that do not provide at least an ______ rating, and in machine rooms and elevator pits for elevators having combustible hydraulic fluids.

3.

FILL IN THE BLANK QUESTION

1 min • 1 pt

Sprinkler systems in vacant, un-occupied areas of buildings shall meet __________ requirements at a minimum, with the sprinkler heads installed in the proper orientation at the correct distances below the ceiling in accordance with NFPA 13.

4.

FILL IN THE BLANK QUESTION

1 min • 1 pt

Sprinkler protection under overhead doors _________ required for overhead doors at passenger car parking garage entrances.

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Caps on 21⁄2-inch outlet valves shall incorporate a __________inch hole for pressure relief.

1"

3/32"

1/4"

1/8"

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Hydrostatic testing is required for sprinkler system modifications where pipe greater than______ inches has been altered.

1.5"

2"

2.5"

3"

7.

FILL IN THE BLANK QUESTION

2 mins • 1 pt

A full-size by-pass shall be installed around the storage tank and the fire pump in accordance with NFPA 20. The by-pass shall be installed on the __________of the tank fill valves and connected to the system on the downstream side of the fire pump and any sprinkler system pressure regulating valves installed on feed mains.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?