Search Header Logo

Level 3 appliance's and commissioning

Authored by Iain Collins

Instructional Technology

1st - 4th Grade

Used 1+ times

Level 3 appliance's and commissioning
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

minimum trap seal left after a discharge test

25mm

30mm

35mm

50mm

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

which of the following must have a 75mm trap seal

Bath

Shower

Basin

WC

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

minimum distance for a high-level WC cistern

0.5m

1m

2m

1.5m

4.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

which of the following may have its own 50mm waste pipe

Bath

Basin

Bidet

Shower

5.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

when carrying an air test, the u-gauge should read?

35mm

36mm

37mm

38mm

6.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

when carrying an air test a u-gauge, the test period should be?

1 minute

2 minutes

3 minutes

5 minutes

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

a junior urinal height from a floor?

400mm

500mm

600mm

800mm

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?