
PENGENALAN APP
Authored by jusman s
Other, Special Education, Specialty
University
Used 6+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
kWh Meter Berfungsi Untuk Mengukur
Daya Listrik
Arus Listrik
Energi Listrik Aktif
Daya Aktif
2.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
MCB yang terpasang pada APP pelanggan dipasang pada
Sebelum kWh Meter Sisi Fasa
Setelah kWh Meter Sisi Fasa
Pada PHB Pelanggan
Setelah kWh Meter Sisi Netral
3.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
kVARh Meter Berfungsi Untuk Mengukur
Daya Reaktif
Arus Listrik
Energi Listrik Reaktif
Daya Listrik
4.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
Energi Listrik yang Diukur Oleh kWh Meter Adalah Hasil Kali Secara Langsung
U.I.COS ϕ
U.I.SIN ϕ
U.I.COS ϕ.t
U.I.SIN ϕ.t
5.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
Energi Listrik Yang Diukur Oleh KVARH Meter Adalah Hasil kali Secara Langsung
U.I.COS ϕ
U.I.SIN ϕ
U.I.COS ϕ.t
U.I.SINϕ. t
6.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
Standar Warna Untuk Pengawatan Kabel Wiring kWh Meter 3 Fase 4 Kawat Untuk Fasa, Netral dan Ground, sesuai Kepdir 139.K/Dir/2011 adalah
R (Merah), S (Kuning), T (Biru), Netral (Hitam), Ground ( Kuning strip Hijau)
R (Merah), S (Kuning), T (Hitam), Netral (Biru), Ground ( Hijau strip kuning)
R (Merah), S (Kuning), T (Kuning strip Hijau), Netral (Hitam), Ground (Biru)
R (Merah), S (Kuning), T (Hitam), Netral (Kuning strip Hijau), Ground (Biru)
7.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
Wiring kWh Meter 3 Fasa, Salah Satu Fasa Pemasangan Wiring Terbalik Maka Energi Yang Tidak Terukur pada kWh Meter adalah
2 Fasa
3 Fasa
1 Fasa
Normal
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?