Lean Waste in Manufacturing

Lean Waste in Manufacturing

University

10 Qs

quiz-placeholder

Similar activities

PLANNING + STEPS

PLANNING + STEPS

University

12 Qs

environmental education

environmental education

University

10 Qs

GLS290 Aerial Camera

GLS290 Aerial Camera

University

10 Qs

CCHU5001_Week 3_Quiz

CCHU5001_Week 3_Quiz

University

10 Qs

mba bnm

mba bnm

University

10 Qs

Project mc²

Project mc²

2nd Grade - Professional Development

11 Qs

Greetings

Greetings

KG - University

10 Qs

Jeffy

Jeffy

KG - Professional Development

10 Qs

Lean Waste in Manufacturing

Lean Waste in Manufacturing

Assessment

Quiz

Education, Design, Other

University

Practice Problem

Hard

Created by

Luqman Amar

Used 17+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many different types waste is in Lean Manufacturing?

4

8

10

5

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the acronym for lean waste?

PLAYTIME

STEMWOOD

TEAMWOOD

TIMWOODS

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one (1) is NOT a Lean waste

Miscommunication

Transportation

Motion

Inventory

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is Lean waste?

Any action or steps in a process that slows down production

Any action or step in a process that does not add value to the customer

An action that wastes time

An action that helps the customer

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The original 7 waste (Muda) was developed by?

Shuntaro Furukawa

Akio Toyoda

Shinzo Abe

Taiichi Ohno

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of these is NOT one of the original 7 waste?

Motion

Over processing

Skills

Defect

7.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

What are the TWO (2) countermeasure for Transportation waste?

Using a ‘Takt Time’ ensures that the rate of manufacturing between stations are even

Purchasing raw materials only when needed and in the quantity needed

Creating flow between processes

Developing a U-shape production line

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?