Construction Documents

Construction Documents

11th Grade

20 Qs

quiz-placeholder

Similar activities

IED End of Quarter review

IED End of Quarter review

8th - 12th Grade

19 Qs

3.02

3.02

9th - 12th Grade

19 Qs

Engineering Design

Engineering Design

9th - 12th Grade

20 Qs

Site Work Operation

Site Work Operation

11th Grade

20 Qs

Unit 104 - Site Preparation

Unit 104 - Site Preparation

9th - 12th Grade

16 Qs

PLTW Design Game

PLTW Design Game

9th - 12th Grade

20 Qs

Manufacturing Process

Manufacturing Process

9th - 12th Grade

15 Qs

21-22 21CB U2 Management Types Review

21-22 21CB U2 Management Types Review

9th - 12th Grade

17 Qs

Construction Documents

Construction Documents

Assessment

Quiz

Instructional Technology, Other

11th Grade

Medium

Created by

Karima Al-Bari Smaw

Used 7+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

________________ are basically notes or other types of explanatory objects (or symbols) that are commonly used to add information to a drawing. Some examples are notes and labels, dimensions, hatches, tables, blocks, and callouts.


Buildings Codes and Specification

Standard Permits

Annotations

ADA Compliances

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The most commonly used scale for residential drawings is _____.


⅛” scale

½” scale

¼” scale

¾” scale

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A(n) _____________ is a specialized ruler designed to facilitate the drafting and measuring of architectural drawings, such as floor plans and orthographic projections.

Protractor

T-Scale

Architect Scale

Engineering Scale

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The ______________ is the phase of rough study drawings that illustrate the basic concepts of the design such as site plan, floor plans, elevations and often illustrative sketches or computer renderings. This most often includes spatial relationships as well as basic scale and forms the owner might desire.


Design Development Phase

Construction Documents Phase

Schematic Design Phase

Construction Administration Phase

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The role of the ______________ provides planning, designing and constructing form, space and ambience. This role extends from urban design and master planning to building design, the design of individual spaces, and even fixtures and fittings.


Construction Manager

Owner

Subcontractor

Architect

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The Electrical trade involves tradesmen that specialize in electrical wiring of buildings, stationary machines, and related equipment.

True

False

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

____________ may be employed working with a system of pipes and fixtures installed in a building for the distribution and use of potable (drinkable) water and the removal of waterborne wastes. (RST 11-12.2)

Mechanical tradesmen

Industrial tradesmen

Plumbing tradesmen

Electrical tradesmen

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?