1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If one is unable to use joist hangers to install floor joists, what has to be cut and nailed for the joists to rest on?

ledgers

rafters

studs

top plates

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When Sheri is framing a building, sills are installed:

anytime.

first.

last.

sixth.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In platform-type framing, the wall studs are nailed:

on the soleplate.

on the ledger.

to the rafters.

to the sills.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If one end of a stud is nailed to the sole plate, where should the other end be nailed?

ceiling joist

floor joist

foundation

top plate

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When Jan uses platform-type framing, where is the top plate attached?

above the ceiling joists

below the studs

on top of the rafters

on top of the studs

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the unit length of a rafter if the total length including 14" overhang is 200"?

14"

100"

186"

200"

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a major advantage of using metal framing anchors?

eliminate floor joists from the framing system

reduce splitting wood caused by toenailing

replace the need for a subfloor system

straighten warped studs

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Microsoft

Continue with Microsoft

or continue with

Facebook

Facebook

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?