Chapter 3: Manufacturing models and metrics

Chapter 3: Manufacturing models and metrics

University

8 Qs

quiz-placeholder

Similar activities

Lean Waste in Manufacturing

Lean Waste in Manufacturing

University

10 Qs

Operation Management

Operation Management

University

10 Qs

QUIZ JIT

QUIZ JIT

University

8 Qs

BMCG 2213 QUIZ 1

BMCG 2213 QUIZ 1

University

10 Qs

National 5 Bus Mgt Ops Quality/Technology/Recycling

National 5 Bus Mgt Ops Quality/Technology/Recycling

KG - University

11 Qs

EDIT 1303

EDIT 1303

University

10 Qs

PT716A_Day2_55_Pilot plant scale up technique :Responsibiliy

PT716A_Day2_55_Pilot plant scale up technique :Responsibiliy

University

10 Qs

Chapter 3: Manufacturing models and metrics

Chapter 3: Manufacturing models and metrics

Assessment

Quiz

Education, Other, Instructional Technology

University

Hard

Created by

SUHAILY MOKHTAR

Used 12+ times

FREE Resource

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

What is the cycle time in a manufacturing operation?

The number of work units completed per hour

The total time from when the operation begins to the point-of-time at which the operation ends

The time interval between the instant of the occurrence of a specified input condition to a system and the instant of completion of a specified operation

The number of business days between receiving an order for a product and shipping the product

2.

FILL IN THE BLANK QUESTION

45 sec • 1 pt

The bottleneck station is the _______ workstation in a production line, and therefore it limits the pace of the entire line.

3.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

What is production capacity?

The ability of time to transfer work units between each cycle

The maximum rate of output that a production facility is able to produce under a given set of assumed operating conditions

The ability of someone or something to hold something

The maximum output that a business can produce in a given period with the available resources

4.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

How can plant capacity be increased or decreased in the short term?

To reduce number of shift per week

To change the number of work shifts per week

To reduce the production rate

To change the number of hours worked per shift

5.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

What is utilization in a manufacturing plant?

Utilization is the actual quantity produced by the facility relative to its capacity

Utilization is the amount of output of a production facility relative to its capacity

Utilization is the proportion of time that a piece of equipment is up and working properly

6.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Choose the example of typical factory overhead expenses?

Plant supervision

Security personnel

Power for machinery

Clerical support

7.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

What is availability?

Availability is the amount of output of a production facility relative to its capacity.

Availability is a reliability metric that indicates the proportion of time that a piece of equipment is up and working properly

Availability is the quantity of parts or products currently located in the factory that are either being processed or are between processing operations

8.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

What is manufacturing lead time?

Manufacturing lead time is the total time required to process a given part or product through the plant, including any lost time due to delays, time spent in storage, reliability problems, and so on.

Manufacturing lead time is the operation time at the bottleneck station

Manufacturing lead time is the cycle of time of the production line