Consist of 2.5kg and 4.5 kg ABC Dry type. These are provided for the Electrical Switch Room, Plant Rooms and tenant spaces.

M&E Services Quiz

Quiz
•
Architecture
•
University
•
Hard

Cove Consultancy
Used 6+ times
FREE Resource
20 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
10 sec • 1 pt
LPG Tank
Fire Extinguisher
Central Plant System
Air Conditioning System
2.
MULTIPLE CHOICE QUESTION
10 sec • 1 pt
1 unit of ‘Volvo Penta’ 300kVA which was configured to supply to the main panel in the event of supply breakout. During power failure, this set will kick in and supply to essential usage such as electricity to common corridor and fire fighting equipments.
LPG System
Main Switchboard
Generator Set
Fire Extinguisher
3.
MULTIPLE CHOICE QUESTION
10 sec • 1 pt
The filtration process should go on for 8 hours every day and the pumps are switched “ON” and “OFF” automatically.
Swimming Pool System
Sanitary Plumbing System
Air Conditioning System
Fire Alarm System
4.
MULTIPLE CHOICE QUESTION
10 sec • 1 pt
Currently, they are 4 DVR with 64 cameras, out of 6 cameras already down. Recommend replacing new cables and cameras to improve the security and surveillance in the building.
Public Address System
Lightning and Earthing System
CCTV System
Fire Alarm System
5.
MULTIPLE CHOICE QUESTION
10 sec • 1 pt
There is outdoor RC tank and two pumps located at the Basement Level to serve the buildings. They are installed in riser at every floor with appropriate signages to indicate the drum sets location.
Water Supply System
Fire Piping System
Sanitary Plumbing System
Building Transportation System
6.
MULTIPLE CHOICE QUESTION
10 sec • 1 pt
There is one RC suction tank located at Basement Level and with a set of vertical in line transfer pumps to pump up to roof storage FRP tanks. The roof storage tanks to serve floor below via a set of hydro pneumatic booster pump.
Air Conditioning System
Swimming Pool System
Water Supply System
Fire Alarm System
7.
MULTIPLE CHOICE QUESTION
10 sec • 1 pt
During the site survey, it is found that most of the copper tapes are concealed inside the wall or column. However, all the finials were missing from the roof which is supposed to be connected down to the copper conductor.
Telecommunication System
Central Plant System
Fire Alarm System
Lightning and Earthing System
Create a free account and access millions of resources
Similar Resources on Quizizz
20 questions
PLUMBING PRINCIPLES AND HISTORY

Quiz
•
University
15 questions
Philippine History of Architecture

Quiz
•
7th Grade - Professio...
15 questions
BUILDING UTILITIES PART 5_COMMUNICATIONS AND SIGNALS

Quiz
•
University
20 questions
BUILDING UTILITIES PART 3_MECHANICAL

Quiz
•
University
20 questions
utilities 1

Quiz
•
University
20 questions
Roof Finishes

Quiz
•
University
15 questions
Town Planning Documents Quiz

Quiz
•
University
20 questions
Disaster Management- Unit-1

Quiz
•
University
Popular Resources on Quizizz
10 questions
Chains by Laurie Halse Anderson Chapters 1-3 Quiz

Quiz
•
6th Grade
20 questions
math review

Quiz
•
4th Grade
15 questions
Character Analysis

Quiz
•
4th Grade
12 questions
Multiplying Fractions

Quiz
•
6th Grade
30 questions
Biology Regents Review #1

Quiz
•
9th Grade
20 questions
Reading Comprehension

Quiz
•
5th Grade
20 questions
Types of Credit

Quiz
•
9th - 12th Grade
50 questions
Biology Regents Review: Structure & Function

Quiz
•
9th - 12th Grade
Discover more resources for Architecture
10 questions
Identifying equations

Quiz
•
KG - University
16 questions
Chapter 8 - Getting Along with your Supervisor

Quiz
•
3rd Grade - Professio...
6 questions
Railroad Operations and Classifications Quiz

Quiz
•
University
71 questions
Logos

Quiz
•
3rd Grade - University
8 questions
Mali - Geography

Quiz
•
University