OREDE-P RGTSU LNG Regasification System

OREDE-P RGTSU LNG Regasification System

Professional Development

7 Qs

quiz-placeholder

Similar activities

Oct - Monthly Breakfast

Oct - Monthly Breakfast

Professional Development

10 Qs

Hospitality Security Services

Hospitality Security Services

Professional Development

10 Qs

Mekari University : HR & Payroll Series

Mekari University : HR & Payroll Series

University - Professional Development

10 Qs

FTHR (future HR)

FTHR (future HR)

Professional Development

10 Qs

End-User Training New HCIS -SF

End-User Training New HCIS -SF

Professional Development

10 Qs

Training new HCIS - SF

Training new HCIS - SF

Professional Development

10 Qs

MyHR-general

MyHR-general

Professional Development

6 Qs

WS FS PLTMG

WS FS PLTMG

Professional Development

11 Qs

OREDE-P RGTSU LNG Regasification System

OREDE-P RGTSU LNG Regasification System

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

Nur Deyana

Used 9+ times

FREE Resource

7 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

The main LNG lines that need to be kept cold to avoid damage to the LNG line would be caused by : EXCEPT

The temperature difference between the top and the bottom of the line that can result in bowing and over-stress

Slugging when the line is brought back into operation, causing vibration and possible cyclic failure of the pipe work

Thermal cycling between operations, unnecessarily stressing the lines

The temperature same between the top and bottom of the line that can result in bowing and over-stress

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the train capacity?

221 t/hr

222 t/hr

223 t/hr

224 t/hr

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Vaporized LNG is metered prior export to shore via _______ or ________pipeline.

36” , 7700mm

30” , 7800mm

28” , 7700mm

4.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Regasification process consist of ___________________, ____________ and ______________


You may tick more than one answer

Intermediate Fluid Vaporizer (IFV).

Sea Water

Propane

ORV

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Propane storage tank has a capacity of ___________.

27 m3

28 m3

29 m3

30 m3

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In the PCHE, LNG will be heated to ___________

-3 °C

-4 °C

-5 °C

-6 °C

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is capacity of Propane Pump?

1020 m1/hr

1030 m2/hr

1040 m3/hr

1050 m3/hr