OREDE-P RGTP Unit 25: Truck Loading
Authored by faris shakir
Physics
Professional Development
Used 4+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
5 questions
Show all answers
1.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
What element includes in Permanent Truck Loading? (You may choose more than one answer).
Weighbridge operation
Truck Routing
Billing Procedure
PTW
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How many truck loading bay operation can be used at the same time?
4
3
1
2
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the purpose of trucking facilities?
Unload Caustic To Truck
Unload Diesel To Truck
Unload LNG To Truck
Unload Nitrogen To Truck
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What are the permissive cooling down temperature for loading bay?
LNG line -130'C , BOG line -50'C
LNG line -150'C , BOG line -50'C
LNG line -120'C , BOG line -50'C
LNG line -100'C , BOG line -50'C
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the correct sequence for unloading activity?
Arm Connection – Depressurize – Leak Test– Cooling Down – Start Loading – Drain & Purging – Arm Disconnection
Arm Connection – Leak Test – Depressurize – Cooling Down – Start Loading – Drain & Purging – Arm Disconnection
Arm Connection – Cooling Down– Depressurize – Leak Test – Start Loading – Drain & Purging – Arm Disconnection
Arm Connection – Drain & Purging – Depressurize – Cooling Down – Start Loading – Leak Test– Arm Disconnection
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?