1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following building components keeps opposite walls from spreading apart?

Trimmer studs

Rafters

Ceiling Joists

Purlins

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To transfer roof loads to the foundation, ceiling joists are usually installed ____.

on a double top plate

between pairs of wall studs

directly over wall studs

with metal anchor plates

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When ceiling joists must be overlapped above a loadbearing partition, the overlap must be at least ______.

3 inches

6 inches

12 inches

18 inches

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A shed dormer is typically used on a house built in the ______.

Federal style

duplex style

Cape Cod style

ranch style

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A board nailed to the tails of the rafters to provide a nailing surface for the fascia is the _____.

purlin

barge board

false fascia

lookout

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The type of cut that is made to a rafter so it will rest squarely on the top plate is the _____.

notch

bird's mouth

sill cut

joist cut

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When laying out rafters, the distance between the last two may be less than 24inches, but not more than ______.

16 inches

18 inches

22 inches

24 inches

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?