1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The functions of the main drain connection and valve are to drain the system_______.

and test the water supply

and keep the piping from freezing

only

and to check anti-freeze solution

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When performing main drain testing, the valve shall be opened and remain open______.

just for a quick second

until the system pressure stabilizes

for 2 seconds

until the needle drops 10 PSI

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Per NFPA requirements, after an impairment, a main drain test shall be performed________.

if there is a concern by the AHJ and requires it for occupancy

any time a valve is closed for more than a week

after a shutdown of over 48 hours or 2 days

any time the control valve is closed and reopened at system riser

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The initial main drain test is critically important to perform and document because_______.

it is the benchmark to compare future test data to

the insurance company requires the test for their records

it proves to the general contractor that the system is live

. it provides the final flush of the system before we finish the job

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Per NFPA 25, a main drain test on a system containing no backflow preventer must be performed at least _______.

weekly

monthly

quarterly

annually

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Per NFPA 13 requirements, fire sprinklers are to be identified by the

Pipe thread size

Piping connection type

Sprinkler Identification Number (SIN)

UL Listing number

Answer explanation

6.2.2* Sprinkler Identification. All sprinklers shall be permanently

marked with one or two English uppercase alphabetic

characters to identify the manufacturer, immediately followed

by three or four numbers, to uniquely identify a sprinkler as to

K-factor (orifice size) or orifice shape, deflector characteristic,

pressure rating, and thermal sensitivity.

7.

FILL IN THE BLANK QUESTION

1 min • 1 pt

Per NFPA 13:For a new fire sprinkler system installation, working plans shall be submitted to the AHJ for approvals_____

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Discover more resources for Professional Development