
Wet Systems Quiz1
Authored by Gregory Bartels
Professional Development
Professional Development

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
8 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The functions of the main drain connection and valve are to drain the system_______.
and test the water supply
and keep the piping from freezing
only
and to check anti-freeze solution
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When performing main drain testing, the valve shall be opened and remain open______.
just for a quick second
until the system pressure stabilizes
for 2 seconds
until the needle drops 10 PSI
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Per NFPA requirements, after an impairment, a main drain test shall be performed________.
if there is a concern by the AHJ and requires it for occupancy
any time a valve is closed for more than a week
after a shutdown of over 48 hours or 2 days
any time the control valve is closed and reopened at system riser
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The initial main drain test is critically important to perform and document because_______.
it is the benchmark to compare future test data to
the insurance company requires the test for their records
it proves to the general contractor that the system is live
. it provides the final flush of the system before we finish the job
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Per NFPA 25, a main drain test on a system containing no backflow preventer must be performed at least _______.
weekly
monthly
quarterly
annually
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Per NFPA 13 requirements, fire sprinklers are to be identified by the
Pipe thread size
Piping connection type
Sprinkler Identification Number (SIN)
UL Listing number
Answer explanation
6.2.2* Sprinkler Identification. All sprinklers shall be permanently
marked with one or two English uppercase alphabetic
characters to identify the manufacturer, immediately followed
by three or four numbers, to uniquely identify a sprinkler as to
K-factor (orifice size) or orifice shape, deflector characteristic,
pressure rating, and thermal sensitivity.
7.
FILL IN THE BLANK QUESTION
1 min • 1 pt
Per NFPA 13:For a new fire sprinkler system installation, working plans shall be submitted to the AHJ for approvals_____
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?
Similar Resources on Wayground
12 questions
Avani Cam Ranh info
Quiz
•
Professional Development
12 questions
Anatomy & Physiology L3 Nails
Quiz
•
Professional Development
11 questions
Bootstrap basics review
Quiz
•
Professional Development
10 questions
Operate Scissor Lift
Quiz
•
Professional Development
10 questions
CS Topic 7 (Resume)
Quiz
•
Professional Development
9 questions
What works in lessons for you?
Quiz
•
Professional Development
10 questions
IBEX A-ISB
Quiz
•
Professional Development
13 questions
RRHH. UD8. McGrawHill
Quiz
•
Professional Development
Popular Resources on Wayground
7 questions
History of Valentine's Day
Interactive video
•
4th Grade
15 questions
Fractions on a Number Line
Quiz
•
3rd Grade
20 questions
Equivalent Fractions
Quiz
•
3rd Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
22 questions
fractions
Quiz
•
3rd Grade
15 questions
Valentine's Day Trivia
Quiz
•
3rd Grade
20 questions
Main Idea and Details
Quiz
•
5th Grade
20 questions
Context Clues
Quiz
•
6th Grade