
MOULD TECHNOLOGY 28/06/2021
Authored by Navaneethakrishnan S
Special Education
University
Used 3+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
6 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Mould Closed Time + Mould Opened time =
Total Cycle Time
Total Cooling Time
Total Ejection Time
Total Injection Time
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
To prevent leakage of coolant a small _________ is fitted in a recess below each insert.
Nut
Heat-pipes
0-ring
Adapters
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The _________ is a standard mould pipe fitting which can be obtained in several sizes.
0-ring
Adapters
Heat-pipes
Heat-rods
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
To block cooling holes end and to make a continues flow _________ are used.
0-rings
Adapters
Heat-pipes
Plugs
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The complete system of water cooling ways in the mould is termed as___________.
Mould block
Hot runner
Water pipe
Cooling circuit
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Opening + Ejection + Closing =
Mould Opened time
Mould Closed Time
Total Cycle Time
Total Cooling Time
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?