1.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
Warehouse Ronin (Warehouse)
Improvement of Good Receive Notes (GRN) Work Process
• Applied lean six sigma method on the GRN by communicate with end user & do the GRN less than ____ days as compared to previous years.
2
3
4
5
2.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
Pull Men (Mechanical P1)
Special Tool for Ease of RO Membrane Change Out
• To reduce ______ case to zero and asset damage to zero.
Brain injury
Finger injury
Leg injury
Shoulder injury
3.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
i-Tracker (TSD Inspection)
Establishing Inspection Worklist Tracking System in Improving 3.1.2 Manage Integrity Program
• i-Tracker facilitates all inspection SAP Notification between plants & reduces ________ in between Inspection Work Execution.
communication
cost
time lag
movement
4.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
The Witch Hunters (Prod. Plant 2)
Equipment Reliability & Structured Round Efficiency Improvement Through Enhanced Visual Management
• To save _______ of operators to identify measurements are deviated from their safe operating limits and ensure equipments are operating within the defined SOL.
manhours
communication
5.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
Flash Point (Prod. Plant 1)
First Line Maintenance Project
• To deploy _____________ as First Line Maintenance based on the identified scope in order to immediately arrest the potential hazards and prevent deterioration over time.
Technicians
Engineers
Plant Operators
Managers
6.
FILL IN THE BLANK QUESTION
45 sec • 1 pt
Vacuuminator (Mechanical P1)
Created Vacuum During Gauge Maintenance
• Created vacuum to avoid process
of ________ ___, hence rectification can be carried out straight away
(a)
7.
FILL IN THE BLANK QUESTION
45 sec • 1 pt
Cas Men (Electrical)
Project Supports Plant Reliability
• Close monitoring will ensure (a) are detected early and prolonging equipment life while maintaining plant running till the next opportunity.
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?