Search Header Logo

OE CI METHANOL LEAGUE DAY 1

Authored by Wanie Johari

Business

Professional Development

Used 10+ times

OE CI METHANOL LEAGUE DAY 1
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

12 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Warehouse Ronin (Warehouse)


Improvement of Good Receive Notes (GRN) Work Process


• Applied lean six sigma method on the GRN by communicate with end user & do the GRN less than ____ days as compared to previous years.

2

3

4

5

2.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Pull Men (Mechanical P1)


Special Tool for Ease of RO Membrane Change Out


• To reduce ______ case to zero and asset damage to zero.

Brain injury

Finger injury

Leg injury

Shoulder injury

3.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

i-Tracker (TSD Inspection)


Establishing Inspection Worklist Tracking System in Improving 3.1.2 Manage Integrity Program


• i-Tracker facilitates all inspection SAP Notification between plants & reduces ________ in between Inspection Work Execution.

communication

cost

time lag

movement

4.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

The Witch Hunters (Prod. Plant 2)


Equipment Reliability & Structured Round Efficiency Improvement Through Enhanced Visual Management


• To save _______ of operators to identify measurements are deviated from their safe operating limits and ensure equipments are operating within the defined SOL.

manhours

communication

5.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Flash Point (Prod. Plant 1)


First Line Maintenance Project


• To deploy _____________ as First Line Maintenance based on the identified scope in order to immediately arrest the potential hazards and prevent deterioration over time.

Technicians

Engineers

Plant Operators

Managers

6.

FILL IN THE BLANK QUESTION

45 sec • 1 pt

Vacuuminator (Mechanical P1)


Created Vacuum During Gauge Maintenance


• Created vacuum to avoid process

of ________ ___, hence rectification can be carried out straight away

(a)  

7.

FILL IN THE BLANK QUESTION

45 sec • 1 pt

Cas Men (Electrical)


Project Supports Plant Reliability


• Close monitoring will ensure (a)   are detected early and prolonging equipment life while maintaining plant running till the next opportunity.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?