Managing Abnormal Operation Condition

Managing Abnormal Operation Condition

1st Grade - Professional Development

15 Qs

quiz-placeholder

Similar activities

Kepedulian lingkungan dan pencegahan polusi

Kepedulian lingkungan dan pencegahan polusi

10th Grade

10 Qs

Tes Awal Sistem Bahan Bakar

Tes Awal Sistem Bahan Bakar

11th Grade

10 Qs

Kuiz WireCut

Kuiz WireCut

University

10 Qs

PSM System

PSM System

Professional Development

15 Qs

MasterGyE-TGyC

MasterGyE-TGyC

University

10 Qs

QUALI LETTERE MANCANO?

QUALI LETTERE MANCANO?

1st Grade

20 Qs

Pre Test Honda Super Cub 125 & Honda Mongkey

Pre Test Honda Super Cub 125 & Honda Mongkey

Professional Development

10 Qs

Managing Abnormal Operation Condition

Managing Abnormal Operation Condition

Assessment

Quiz

Other

1st Grade - Professional Development

Medium

Created by

Process Safety

Used 6+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Suatu fasilitas beroperasi diluar Safe Operating Limit (SOL), hal ini berhubungan dengan aspek:

Design & Construction

Program & Prosedur

Human

Semua jawaban benar

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Setting point PSV

Di atas SOL (Safe Operating Limit)

Di bawah SOL (Safe Operating Limit)

Dalam rentang SOL (Safe Operating Limit)

Dalam rentang NOL (Normal Operating Limit)

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Manakah proteksi yang menjaga operasi berada dalam kondisi normal (NOL):

Control system

Shutdown system

Pressure relief system

Blowdown system

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Insiden Process Safety dapat mengakibatkan

Kecelakaan kerja dan/atau kematian

Dampak lingkungan

Pengaruh buruk bagi reputasi perusahaan

Semua jawaban benar

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Manajemenn resiko dari suatu abnormal operasi yang berhubungan dengan SCE dilakukan dengan:

HAZOP

SCEARA

HAZID

Risk Register

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Apa kepanjangan dari SCEARA

Safety Critical Element Abnormal Risk Assessment

Safety Critical Evaluation & Risk Assessment

Safety Critical Element Analysis & Risk Assessment

Safety Critical Element Deviation Risk Assessment

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Salah satu tahapan dalam SCEARA adalah melakukan Initiation meeting yang difasilitasi oleh

Process Safety Coach

Operation Manager

TA Discipline

General Manager (GM)

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?