If factors indicate that materiality will be revised downward by 20% or more, which combination of the following steps should we take:
I. Revise materiality
II. Consult with DPP if materiality is not revised
III. Revise performance materiality
IV. Evaluate the effect on risk assessment
V. Reconsider RMs that did not rise to the level of RMMs