1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

A circuit uses a 45-amp BS 88-3 cartridge fuse as a means of protection, what is the tabulated disconnection time for an overcurrent of 550 amps?

a)        0.1 second
b)        0.2 second
c)        0.4 second
d)        1.0 second

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Which BS standard covers ceiling roses?

a)         BS 5655
b)            BS 67
c)              BS EN 81
d)         BS EN 50438

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Which is the principal organisation responsible for 'Distributors Installations' in the UK?

a)             The heaIth and safety executive
b)             The local authority organisation
c)             The department for innovation and skills
d)            The home department

4.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

The group rating factor for a group of five different sized sheathed cables is?

a) 0.325
b) 0.447
c) 0.528
d) 0.632

5.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

With reference to energy efficiency systems, on-site renewable energy sources?

a)     Increase the efficiency of an electrical installation
b)      Reduce the efficiency of an electrical installation
c)      Reduce the overall public electricity network losses
d)     May be considered a direct energy efficiency measure

6.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

When measuring the prospective fault current in a three-phase installation the highest prospective fault current will occur?

a)      When a short circuit develops between a line and neutral conductor
b)      When a short circuit develops between a line and earth conductor
c)      When a short circuit develops between two-line conductors
d)     When a short circuit develops simultaneously between all line conductors

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

With reference to AC motors used within an energy efficiency system, what method can be used to achieve higher energy efficiency?

a)     Install less powerful motors
b)     Install more powerful motors
c)     Install variable speed drives
d)     Install fixed speed drives

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?