Revision Quiz: Flood Management Strategies

Authored by Low Ching Kai

Geography

8th - 10th Grade

Used 2+ times

Revision Quiz: Flood Management Strategies
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Media Image

Which flood management strategy is shown in the image?

Construction of Levees

Channel Improvement

Elevated Properties

Land Use Zoning

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following statement(s) best describe channel improvement?

Channel improvement helps to increase channel capacity to transport floodwaters away more efficiently

Channel improvement will help to prevent rainfall from accumulating as surface runoff.

Channel improvement involves widening and deepening of the river channel

All of the above

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is channel improvement a desirable strategy to be used to manage floods in Singapore?

It is affordable

Singapore has many existing canals and drains that must be improved on

It allows urban development to take place on land adjacent to river channels

It is the best method to manage flash floods

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is one disadvantage of implementing channel improvement strategies?

May lead to flooding issues upstream or downstream

Requires a long period of time to construct

There is a limit to channel widening and deepening because of existing soil conditions

Not feasible in areas with no existing canals/rivers

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Minimum platform level(s) are most commonly used to manage _______________ floods.

Coastal

River

Flash

Storm

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Under what scenario do we need to make changes to the minimum platform level(s) to be constructed?

When buildings require regular maintenance

When channel improvement is not possible

When properties are located adjacent to water bodies

When there are changes to the highest recorded flood level

7.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The highest water level recorded during a flood along Orchard Road was 30cm. What should be the minimum height of the raised platform level of buildings along Orchard Road?

10cm

20cm

30cm

50cm

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?