1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which group classification belongs projects involving extensive detail such furniture design, built –in equipment, special fittings, screens, counters, interiors and other detailed parts of appurtenances of buildings or structures and landscaping designs?

Group 8

Group 2

Group 1

Group 4

Answer explanation

Ref. SPP 202 4.4.8 page 22

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

a foreign architect practicing architecture in the Philippines for projects on Philippine soil must first secure a ____________ and a work permit from the______________________

Department of Labor and Employment (DOLE) ; Temporary / special permit (TSP)

Temporary / special permit (TSP) ; Department of Labor and Employment (DOLE)

Temporary / special permit (TSP) ; Department of Trade and Industry

Department of Trade and Industry; Temporary / special permit (TSP)

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

This phase consists of the preparation of schematic design studies derived from the Project Definition Phase, leading to conceptual plans.

Schematic Design Phase

Project Definition Phase

Design Development Phase

Contract Document Phase

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which group classification belongs projects involving alterations, renovations, rehabilitations, retrofit and expansion / additions to existing buildings belonging to Groups 1 to 5

Group 4

Group 6

Group 9

Group 10

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A foreign architect practicing architecture in the Philippines for projects on Philippine soil must have a _______________ Architect.

Local Counterpart

Allied Foreign

Allied Proffessional

None of the above

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Under the of SCOPE OF SERVICES, the architect prepares the complete Contract Documents consisting of detailed designs and construction drawings, setting forth in detail the work required for the architectural, structural, electrical, plumbing/ sanitary, mechanical, electronic and communication works prepared by the Architect and the respective professionals involved.

Project Definition Phase

Schematic Design Phase

Design Development Phase

Contract Document Phase

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Under CONTRACT DOCUMENT PHASE, the architect prepares Technical Specifications describing type and quality of materials, finish, manner of construction and the general conditions under which the project is to be constructed. How many sets of construction drawings should the architect submit to the owner for obtaining a Building Permit?

5

6

7

8

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?