Well Intervention - Revision Quizzes

Well Intervention - Revision Quizzes

University

25 Qs

quiz-placeholder

Similar activities

RAD 245 Exam 2 Review

RAD 245 Exam 2 Review

University

20 Qs

Ultimate Cheese Fan Quiz

Ultimate Cheese Fan Quiz

KG - Professional Development

20 Qs

Water Supply Part 5

Water Supply Part 5

University

20 Qs

Trick

Trick

8th Grade - Professional Development

21 Qs

Cardiac Procedures Pt II- Quiz

Cardiac Procedures Pt II- Quiz

University

22 Qs

TÌM HIỂU COVID 19 - NHẬN QUÀ MÊ TÍT

TÌM HIỂU COVID 19 - NHẬN QUÀ MÊ TÍT

University

20 Qs

All About Ashlee

All About Ashlee

University - Professional Development

21 Qs

Nurs 315 Final Exam Practice Problems

Nurs 315 Final Exam Practice Problems

University

25 Qs

Well Intervention - Revision Quizzes

Well Intervention - Revision Quizzes

Assessment

Quiz

Other

University

Medium

Created by

Chai Fu

Used 14+ times

FREE Resource

25 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Well intervention can be carried out in: 

live wells only 

dead wells only 

both live and dead wells

none of the answer

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which wireline operation allows real-time recording of pressure and temperature?

E-line

Slickline

E-line and slickline

E-line, slickline and braided line

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following well problem cannot be performed using slickline operation?

installation of gas lift valve

shifting slide door sleeves

sand bailing and debris

cementing

Answer explanation

Cementing requires pumping of fluids into the well. Slickline does not allow pumping fluids. This can only be done using direct pumping unit, coiled tubing unit and hydraulic workover unit

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following operation has to be carried out using hydraulic workover?

wellbore cleanout

fishing

setting plug

replacement of production tubing

Answer explanation

Slickline unit and coiled tubing unit only able to conduct light well intervention. Heavy well  intervention such as pulling out of production tubing and casing have to be carried out using hydraulic workover. 

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The following diagram represents the reservoir performance. A production gap exists as reservoir do not effectively deliver hydrocarbon into a wellbore. Which of the following does not help to improve the situation?

perforation

acidising and fracturing

isolate the high water cut formation zone

remove scale in the production tubing

Answer explanation

The result of reservoir performance is low flow rates at high-drawdown pressures. The problem may be overcome by focusing solution at the reservoir and IPR curve.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The graph focuses on flow-conduit performance. Which of the following can help to improve the flow-conduit performance?

coiled tubing completion

remove restrictions in the production tubing

clean out the debris in the tubing

all of the mentioned

Answer explanation

If tubulars are improperly sized and if there are unnecessary mechanical restrictions such as scale buildups inside the tubing and casing.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is the primary well barrier of slickline operation?

BOP

stuffing box

downhole safety valve

drilling mud

Answer explanation

Primary well barrier - stuffing box (slickline operation can perform in live well. Stuffing box is activated to seal the well pressure.

Secondary well barrier - BOP. Only activated when primary well barrier fails or powerpack failure or other emergency situation.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?