1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
With reference to a large job with all trades in attendance, which one of the following
information sources states who is responsible for cutting holes in walls and floors, for systems pipework?
Job specification.
Site plan.
Water Regulations.
Installation plan
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
An extension light with a bulb protector of unbreakable glass or wire cage will usually be
required when working
in bathrooms
in roof spaces
in a kitchen
on sheet lead
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A pre-installation inspection of an occupied dwelling, where a new bathroom suite is to be
installed, reveals dirt marks on the landing wall. These are brought to the attention of the
customer who states that it does not matter as they are going to re-decorate. The correct
action would be to
record that this has been brought to the customer’s attention, but not report to the job
supervisor, because it will not be a problem
carry on with the work without taking any further action
try to be helpful to the customer and attempt to remove the marks
record that this has been brought to the customer’s attention and report the facts to the immediate job supervisor
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A cast iron bath needs to be moved to the first floor bathroom in an occupied private property.
Which of the following actions should be taken?
Remove the stairs to permit the bath to be lifted to the first floor location
Build a timber crate around the bath to help with the lifting process.
Carefully cover all the carpeted surfaces with thick dust sheets.
No particular actions are necessary.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Upon completion of the plumbing installations on an estate of new dwellings, each homeowner must be provided with
the appliance operating instructions
the site plan showing the position of their house on the site
copies of all material delivery notes for work on their house
copies of the work schedules for work on their house.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A delivery advice note is provided by the
customer to let the supplier know when to deliver materials
customer to confirm the details of the materials required
supplier to confirm the number and type of materials that are delivered
customer to show the delivery address for materials.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which one of the following documents states the exact price that a plumber’s merchant will
supply materials for?
Estimate.
Specification.
Invoice.
Quotation.
Create a free account and access millions of resources
Similar Resources on Wayground
28 questions
Unit 5 Common Plumbing Processes

Quiz
•
Professional Development
25 questions
MG - COMET EV

Quiz
•
Professional Development
33 questions
Drainage Systems 6035-02 | Part 5

Quiz
•
Professional Development
28 questions
Unit 109 Copper-Pipework

Quiz
•
Professional Development
30 questions
LV03 mock exam

Quiz
•
Professional Development
25 questions
Unit 109 Copper-Pipework

Quiz
•
Professional Development
26 questions
Irrigation

Quiz
•
Professional Development
25 questions
Building Laws Quiz 5 & 6- BP220 & PD 957

Quiz
•
KG - Professional Dev...
Popular Resources on Wayground
11 questions
Hallway & Bathroom Expectations

Quiz
•
6th - 8th Grade
20 questions
PBIS-HGMS

Quiz
•
6th - 8th Grade
10 questions
"LAST STOP ON MARKET STREET" Vocabulary Quiz

Quiz
•
3rd Grade
19 questions
Fractions to Decimals and Decimals to Fractions

Quiz
•
6th Grade
16 questions
Logic and Venn Diagrams

Quiz
•
12th Grade
15 questions
Compare and Order Decimals

Quiz
•
4th - 5th Grade
20 questions
Simplifying Fractions

Quiz
•
6th Grade
20 questions
Multiplication facts 1-12

Quiz
•
2nd - 3rd Grade