A Product Overview for UPS and Cooling Product Line

A Product Overview for UPS and Cooling Product Line

Professional Development

10 Qs

quiz-placeholder

Similar activities

Galaxy A Series 2021

Galaxy A Series 2021

Professional Development

10 Qs

Festive Quiz Oct'22

Festive Quiz Oct'22

Professional Development

15 Qs

REFRESHMENT S20FE AND A21S

REFRESHMENT S20FE AND A21S

University - Professional Development

15 Qs

PRE & POST TEST

PRE & POST TEST

Professional Development

10 Qs

APC Webinar - 19 May 2020

APC Webinar - 19 May 2020

Professional Development

10 Qs

KYC2KYC MASS2 - Realme C1 & Nokia 3.1+

KYC2KYC MASS2 - Realme C1 & Nokia 3.1+

Professional Development

12 Qs

L1AM10

L1AM10

Professional Development

12 Qs

EXAM TAB A8 DEC '21

EXAM TAB A8 DEC '21

Professional Development

10 Qs

A Product Overview for UPS and Cooling Product Line

A Product Overview for UPS and Cooling Product Line

Assessment

Quiz

Professional Development

Professional Development

Hard

Created by

Lester Piedad

Used 1+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the third step in UPS sizing?

Calculate the power drawn of each equipment.

Accommodate future growth.

Identify all the equipment that needs to be protected.

Sum the load of all devices that will be connected to the UPS.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Symmetra LX have part numbers starting with SYA/SYH. What is the service lifecycle of Symmetra LX?

4 years

5 years

6 years

7 years

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

It is a part of the Galaxy V series with power rating ranging from 160 kVA to 200 kVA.

Galaxy VS

Galaxy VM

Galaxy VL

Galaxy VX

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For a UPS with serial number QD0805360031, what is the UPS' manufacturing date?

August 2005

February 2008

March 2005

March 2008

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is not a cooling requirement for a new data center cooling system?

heat density

number of data center personnel

maintenance

budget limitations

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a new data center that is in need of a cooling system, calculate its heat capacity (in kilowatt, kW) if it houses 10 racks with 25 servers each. Note: Each server racks is rated at 200 W.

50 000

50

25 000

25

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Rack Mount Air Conditioners addresses the escalating demand for rack-based cooling. On which part of the rack is it located?

at the sidewalls

at the bottom

at the top

outside the rack

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?