LARO 21: Synergy - Building Utilities

LARO 21: Synergy - Building Utilities

Professional Development

10 Qs

quiz-placeholder

Similar activities

Housing Planning

Housing Planning

University - Professional Development

10 Qs

APR Review - Prof Prac - Session 04 - Quiz 1

APR Review - Prof Prac - Session 04 - Quiz 1

Professional Development

10 Qs

Theory of Architecture (Part 3)

Theory of Architecture (Part 3)

University - Professional Development

10 Qs

SRB Product

SRB Product

Professional Development

10 Qs

Monthly JATC 1/24

Monthly JATC 1/24

Professional Development

10 Qs

Site Planning

Site Planning

Professional Development

15 Qs

Teste - Domínio 1 - Design de arquiteturas seguras

Teste - Domínio 1 - Design de arquiteturas seguras

Professional Development

15 Qs

SPP Doc. 201 - Pre Design Service

SPP Doc. 201 - Pre Design Service

Professional Development

14 Qs

LARO 21: Synergy - Building Utilities

LARO 21: Synergy - Building Utilities

Assessment

Quiz

Architecture

Professional Development

Hard

Created by

UAPGA Education

Used 173+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

It refers to an individual who worked in the sanitary field of ancient Rome.

Plumber

Plumbarius

Plumbum

Plumplum

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The minimum vertical distance from the bottom of water pipes to the top of sewer or drain pipe if laid in the same trench on top of the other.

300mm

500mm

200mm

100mm

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Vertical flow of air used to separate different functions of spaces.

Air curtain

Air wall

Air vent

Air circulation

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

How many days, at least, shall be given before any plumbing work inspection is done after written notice for inspection?

3

4

5

6

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

A term applied to the interconnection of the same fixtures in one soil or waste branch with one branch vent.

Union

Battery of fixtures

Connection of fixtures

Series

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Minimum wire size in square millimeter for a branch circuit with a 30-ampere rating using Type THW stranded copper conductor in a raceway.

1.5 sqmm

2 sqmm

4.5 sqmm

5.5 sqmm

7.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

A vent pipe connected to a vent stack.  

Relief vent

Circuit vent

Loop vent

Stack vent

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?