Search Header Logo

PSOC Sample test

Authored by pradeep reddy

Professional Development

Used 3+ times

PSOC Sample test
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which of the following substation layouts sectionalizes the bus so that the entire substation is not shutdown in the event of a bus fault?

Single bus with tie breaker, ring bus
One and half breaker
Double bus double breaker
Main and<br /> Transfer

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Non-compliance of directions issued by RLDCs/ SLDCs evokes a penalty of maximum

Rs. 5 lakhs
Rs. 10 lakhs
Rs. 15 lakhs
Rs. 20 lakhs

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which switching arrangement does not require a separate bus bar protection?

Double bus
Ring bus
One and half breaker
Double Main with transfer

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is the time limitation for filing Appeal before the Appellate Tribunal?

30 DAYS
60 DAYS
90 DAYS
45 DAYS

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The EC Act 2001 is applicabe to

Whole India
Whole India Except North Eastern States
Whole India Except Jammu & Kashmir
Whole India Except Union Teritories

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The number of ammendments made to the EC Act till date is

1
2
3
4

7.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The different limits to be considered while evaluating TTC are:

Stability, voltage and thermal limits
Sag, active power and reactive power
temperature, pressure and relative humidity
MVA

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Microsoft

Continue with Microsoft

or continue with

Facebook

Facebook

Apple

Apple

Others

Others

Already have an account?