PSOC Sample test

PSOC Sample test

40 Qs

quiz-placeholder

Similar activities

Round 1

Round 1

KG - University

39 Qs

MGNF - 51

MGNF - 51

University - Professional Development

40 Qs

Baroda Academy, Rajkot _2022-23_PPT QUIZ for CL to Officer Day-1

Baroda Academy, Rajkot _2022-23_PPT QUIZ for CL to Officer Day-1

Professional Development

40 Qs

Monthly Test - FA (Equation, Journal, ledger)

Monthly Test - FA (Equation, Journal, ledger)

Professional Development

40 Qs

general banking

general banking

Professional Development

45 Qs

3rd Sem Model

3rd Sem Model

University

40 Qs

Nirmaan - Pariksha - Products

Nirmaan - Pariksha - Products

Professional Development

35 Qs

Day 6 OYO Interface Test Batch 58

Day 6 OYO Interface Test Batch 58

KG

37 Qs

PSOC Sample test

PSOC Sample test

Assessment

Quiz

Professional Development

Medium

Created by

pradeep reddy

Used 3+ times

FREE Resource

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which of the following substation layouts sectionalizes the bus so that the entire substation is not shutdown in the event of a bus fault?
Single bus with tie breaker, ring bus
One and half breaker
Double bus double breaker
Main and<br /> Transfer

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Non-compliance of directions issued by RLDCs/ SLDCs evokes a penalty of maximum
Rs. 5 lakhs
Rs. 10 lakhs
Rs. 15 lakhs
Rs. 20 lakhs

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which switching arrangement does not require a separate bus bar protection?
Double bus
Ring bus
One and half breaker
Double Main with transfer

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is the time limitation for filing Appeal before the Appellate Tribunal?
30 DAYS
60 DAYS
90 DAYS
45 DAYS

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The EC Act 2001 is applicabe to
Whole India
Whole India Except North Eastern States
Whole India Except Jammu & Kashmir
Whole India Except Union Teritories

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The number of ammendments made to the EC Act till date is
1
2
3
4

7.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The different limits to be considered while evaluating TTC are:
Stability, voltage and thermal limits
Sag, active power and reactive power
temperature, pressure and relative humidity
MVA

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?