Server Day 2 - 2nd review

Server Day 2 - 2nd review

University

50 Qs

quiz-placeholder

Similar activities

UAS SEMESTER GANJIL INFORMATIKA XI 2024

UAS SEMESTER GANJIL INFORMATIKA XI 2024

11th Grade - University

50 Qs

PTS 1 Informatika

PTS 1 Informatika

12th Grade - University

50 Qs

DS-UNIT-2-Stack Queue

DS-UNIT-2-Stack Queue

University

50 Qs

Midterm prep 10 gr

Midterm prep 10 gr

10th Grade - University

45 Qs

C PROGRAMMING -II INTERNALS EXAMINATIONS - SEP 2021

C PROGRAMMING -II INTERNALS EXAMINATIONS - SEP 2021

University

50 Qs

Trivia MKTD

Trivia MKTD

7th Grade - University

50 Qs

Ass3

Ass3

University - Professional Development

50 Qs

Quiz Matematika Diskrit

Quiz Matematika Diskrit

University

50 Qs

Server Day 2 - 2nd review

Server Day 2 - 2nd review

Assessment

Quiz

Computers

University

Practice Problem

Hard

Created by

Rehan Ahmed

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

50 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A technician installs a new server and realizes that there is no option to enable out-of-band management in the server settings. The server is connected to e PDU and a network switch with no operating system running. What should the technician do?

Install an SSH package on the server and use the existing NIC card to manage the server remotely.

Order a dedicated card or enablement kit. Connect the card to the network switch.

Install an 008 (out-of-bard) PCI express card. Use a fiber-optic cable and connect to the switch using a SAS adapter.

use the PDU to manage the server remotely.

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A company wants to connect a server to a 10GbE network switch using an optical multimode 3 (0M3) network cable. What is the expected distance of the cable run in this instance?

Up to 40km

Up to 100m

up to 300m

Up to 100km

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Refer to the exhibit. A technician has almost finished deploying a new rack. What should be used in SLOT A? The cost should be kept to a minimum.

Patch panel

Blanking panel

Cable manager for power cables

PDU

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A technician is preparing to install a hard disk enclosure with the following width, height, and depth:

19" X 2.50" X 19.67"

What is the minimum number of free contiguous rack units that are required for installation?

1U

2U

5U

4U

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

An administrator is installing multiple rack-mounted servers that include multiple hot-swappable components. The administrator wants to avoid shutting down the server when pulling the server forward to remove and replace hot-swappable components.

What should the administrator install to avoid this situation?

Fixed rail kits

Sliding rail kits

Air baffle kits

Cable management arms

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

An administrator wishes to connect a server to a switch located in the same comms room. The administrator examines the switch and confirms that there are two ports available as shown in the exhibit. A cable has been connected to the server already. What should the administrator do?

Replace the cable and use a single mode SC cable.

Check the HCL documentation and install a dedicated expansion card in the switch.

Install an RJ45 media converter and connect to the switch using an adapter.

Use an LC SFP module and install it in the switch.

7.

MULTIPLE SELECT QUESTION

1 min • 1 pt

A server administrator is planning a new rack server installation. They are developing installation plans to provide for safety, reliability, accessibility, and reduced cost. Which installation guidelines should the administrator keep in mind in their design plan? (Select TWO)

Leave a 10 free space between each server and mounted device.

Rack enclosures should be located as near or directly under air conditioning units whenever possible.

Multiple rack enclosures should be mounted in solid rows when the front of one rack faces the

rear of another rack (front-to-back).

UPS and other heavy devices should be located as low in the rack as possible.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?