1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Soundness Testing of Rigid Pipework (Copper and Steel). Select the correct pocess.

Slowly fill the system with water

Walk around system and check for leaks

Leave to stand for 60 minutes (temperature stabilisation)

Attach the hydraulic test bucket

Pump system up to 1.5 times the working pressure (if system works at 3bar it should be tested at 4.5bar etc)

Leave for one hour

Check for any pressure drop (no drop allowed)

Rectify and re-test if necessary

Slowly fill the system with water

Walk around system and check for leaks

Leave to stand for 30 minutes (temperature stabilisation)

Attach the hydraulic test bucket

Pump system up to 2.5 times the working pressure (if system works at 3bar it should be tested at 4.5bar etc)

Leave for one hour

Check for any pressure drop (no drop allowed)

Rectify and re-test if necessary

Slowly fill the system with water

Walk around system and check for leaks

Leave to stand for 30 minutes (temperature stabilisation)

Attach the hydraulic test bucket

Pump system up to 1.5 times the working pressure (if system works at 3bar it should be tested at 4.5bar etc)

Leave for one hour

Check for any pressure drop (no drop allowed)

Rectify and re-test if necessary

Slowly fill the system with water

Walk around system and check for leaks

Leave to stand for 30 minutes (temperature stabilisation)

Attach the hydraulic test bucket

Pump system up to 1.5 times the working pressure (if system works at 3bar it should be tested at 4.0bar etc)

Leave for one hour

Check for any pressure drop (no drop allowed)

Rectify and re-test if necessary

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Soundness testing

Before soundness testing, always walk around the system to make sure all joints have been made – visual check:

•Read MI

•Soldered joints made

•Open Compression joints

•Clips are in place

•Check for Open ends

•Soldered joints made

•Compression joints tight

•Clips are in place

•Open ends are open

•Soldered joints made

•Compression joints tight

•Clips are in place

•Open ends

•Soldered joints made

•Compression joints tight

•Clips are removed

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Place in the correct order.

Final Check

Set up equipment

Visual Inspection

Test Period

Complete-Documentation

Complete-Documentation

Test Period

Visual Inspection

Set up equipment

Final Check

Set up equipment

Visual Inspection

Test Period

Final Check

Complete-Documentation

Visual Inspection

Set up Equipment

Test Period

Final Check

Complet-Documentation

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Select the correct soundness test process for Plastic Pipe (Polybutylene)

Test A

•Slowly fill the system with water

•Walk around system and check for leaks

•Pump system to 1bar; after 45 minutes check for loss of pressure

•Increase pressure to 1.5 times working pressure for 30 minutes

•Check for pressure loss

•Reduce pressure to one-third for a further 45 minutes

•Check for pressure loss

•You do not want to damage the plastic pipe or O rings.

•Slowly fill the system with water

•Walk around system and check for leaks

•Pump system to 1bar; after 45 minutes check for loss of pressure

•Increase pressure to 1.5 times working pressure for 15 minutes

•Check for pressure loss

•Reduce pressure to one-third for a further 45 minutes

•Check for pressure loss

•You do not want to damage the plastic pipe or O rings.

•Slowly fill the system with water

•Walk around system and check for leaks

•Pump system to 1bar; after 45 minutes check for loss of pressure

•Increase pressure to 1.5 times working pressure for 30 minutes

•Check for pressure loss

•Reduce pressure to one-third for a further 45 minutes

•Check for pressure loss

•You do not want to damage the plastic pipe or O rings.

•Slowly fill the system with water

•Walk around system and check for leaks

•Pump system to 1bar; after 45 minutes check for loss of pressure

•Increase pressure to 2.0 times working pressure for 15 minutes

•Check for pressure loss

•Reduce pressure to one-third for a further 60 minutes

•Check for pressure loss

•You do not want to damage the plastic pipe or O rings.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Select the correct process for Soundness Testing Plastic Pipe (Polybutylene)

Test B

•Slowly fill the system with water

•Walk around system and check for leaks

•Pump system to manufacturer’s test pressure

•Inspect the pressure loss after 30 minutes

•Leave for a further 120 minutes

•Inspect for pressure loss

•If total loss is less than 0.5bar, soundness is good

•You do not want to damage the plastic pipe or O rings

•Slowly fill the system with water

•Walk around system and check for leaks

•Pump system to manufacturer’s test pressure

•Inspect the pressure loss after 45 minutes

•Leave for a further 60 minutes

•Inspect for pressure loss

•If total loss is less than 0.1bar, soundness is good

•You do not want to damage the plastic pipe or O rings

•Slowly fill the system with water

•Walk around system and check for leaks

•Pump system to manufacturer’s test pressure

•Inspect the pressure loss after 30 minutes

•Leave for a further 60 minutes

•Inspect for pressure loss

•If total loss is less than 0.2bar, soundness is good

•You do not want to damage the plastic pipe or O rings

•Slowly fill the system with water

•Walk around system and check for leaks

•Pump system to manufacturer’s test pressure

•Inspect the pressure loss after 30 minutes

•Leave for a further 120 minutes

•Inspect for pressure loss

•If total loss is less than 0.2bar, soundness is good

•You do not want to damage the plastic pipe or O rings

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Add disinfectant to a system (sodium hypochlorite solution or chlorine) for 1 hour

as prescribed in which, British Standard?

BS1010 part 2

BS6700

BS EN 1175

BS EN 6800

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What is shown in the photo?

Hydraulic Gas Boiler Test Equipment

Flue Pressure Tester

Hydraulic Pipe Pressure Tester

Hydraulic Drain equipment

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?