BECE2093 ENGINEERING MANAGEMENT & BMCE1053 CONSTRUCTION ENG

BECE2093 ENGINEERING MANAGEMENT & BMCE1053 CONSTRUCTION ENG

University

10 Qs

quiz-placeholder

Similar activities

Curación de úlceras por presión

Curación de úlceras por presión

University - Professional Development

10 Qs

Costa's Levels of Questioning

Costa's Levels of Questioning

6th Grade - University

15 Qs

S11 Plan de redacción Sintg

S11 Plan de redacción Sintg

University

10 Qs

CA M02 SUB 2

CA M02 SUB 2

University

12 Qs

RBT Tingkatan 2 Bab 2.2 : Reka Bentuk Mekanikal

RBT Tingkatan 2 Bab 2.2 : Reka Bentuk Mekanikal

1st Grade - Professional Development

12 Qs

Toxic Responses to Kidney II

Toxic Responses to Kidney II

University

10 Qs

Item Construction

Item Construction

University - Professional Development

10 Qs

Trends in Assessment

Trends in Assessment

University

10 Qs

BECE2093 ENGINEERING MANAGEMENT & BMCE1053 CONSTRUCTION ENG

BECE2093 ENGINEERING MANAGEMENT & BMCE1053 CONSTRUCTION ENG

Assessment

Quiz

Life Skills, Professional Development

University

Hard

Created by

DR. SITI NORSITA MOHD RAWI

Used 3+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Parties involved during the construction except

Supplier

Authorities

FInancial company

Jabatan Kerja Raya

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Role of contractor are ;

i) To built and complete the construction based on contract.

ii) To comply with the local authorities regulation.

iii) Own and finance the project.

iv) to bear all the carried out and completed work at the site.

i, ii and iii

i, ii and iv

i and iv

iii and iv

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Local authorities during construction are....

i) Tenaga Nasional Berhad

ii) Telekom Malaysia

iii) Jabatan Bomba & Penyelamat

iv) Indah Water Konsortium

ii, iii dan iv

i, ii, iii and iv

i and iii

i and iv

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Role of Jabatan Kerja Raya are..

i) Provide guidance on construction technology advice

ii) Provide technical advice to the government at the state, state and district levels

iii) Examine and test the completed fire prevention system.

iv) Ensure clients comply with EIA orders.

i dan ii

i and iii

i and iv

iii and iv

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Characteristic of construction management are ....

i) Complex and it involves a number of individuals from different departments.

ii) Unique and cannot be replicated.

iii) Consists of a number of associated activities

iv) Satisfy the owners requirement and expectations from the project.

i and ii

i and iii

ii, iii and iv

i,ii, iii and iv

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The major differences between  projects and operations are:

Projects are ongoing and operations are short

Projects should always be done by engineers and operations may be performed by technicians

Projects and operations are the same thing but projects always costs more to implement

Projects are temporary and operations are ongoing

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

How are project costs calculated?

By adding up the costs of all materials

By adding human resources (staff hours times billing rates), plus the marked-up costs of material resources

By a calculation so complicated only a computer could do it

By multiplying the human resources by the material resources

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?