Parties involved during the construction except

BECE2093 ENGINEERING MANAGEMENT & BMCE1053 CONSTRUCTION ENG

Quiz
•
Life Skills, Professional Development
•
University
•
Hard

DR. SITI NORSITA MOHD RAWI
Used 3+ times
FREE Resource
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Supplier
Authorities
FInancial company
Jabatan Kerja Raya
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Role of contractor are ;
i) To built and complete the construction based on contract.
ii) To comply with the local authorities regulation.
iii) Own and finance the project.
iv) to bear all the carried out and completed work at the site.
i, ii and iii
i, ii and iv
i and iv
iii and iv
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Local authorities during construction are....
i) Tenaga Nasional Berhad
ii) Telekom Malaysia
iii) Jabatan Bomba & Penyelamat
iv) Indah Water Konsortium
ii, iii dan iv
i, ii, iii and iv
i and iii
i and iv
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Role of Jabatan Kerja Raya are..
i) Provide guidance on construction technology advice
ii) Provide technical advice to the government at the state, state and district levels
iii) Examine and test the completed fire prevention system.
iv) Ensure clients comply with EIA orders.
i dan ii
i and iii
i and iv
iii and iv
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Characteristic of construction management are ....
i) Complex and it involves a number of individuals from different departments.
ii) Unique and cannot be replicated.
iii) Consists of a number of associated activities
iv) Satisfy the owners requirement and expectations from the project.
i and ii
i and iii
ii, iii and iv
i,ii, iii and iv
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The major differences between projects and operations are:
Projects are ongoing and operations are short
Projects should always be done by engineers and operations may be performed by technicians
Projects and operations are the same thing but projects always costs more to implement
Projects are temporary and operations are ongoing
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How are project costs calculated?
By adding up the costs of all materials
By adding human resources (staff hours times billing rates), plus the marked-up costs of material resources
By a calculation so complicated only a computer could do it
By multiplying the human resources by the material resources
Create a free account and access millions of resources
Similar Resources on Wayground
15 questions
RBT T2 BAB 2.3 Rekabentuk Elektrik [Bah A]

Quiz
•
1st Grade - Professio...
15 questions
RBT T2 BAB 2.2 Rekabentuk Mekanikal [Bah A]

Quiz
•
1st Grade - Professio...
9 questions
Práctica final

Quiz
•
University
10 questions
PECS phases I-III

Quiz
•
University
10 questions
Work Ethics

Quiz
•
University
10 questions
Semana 11 Acv: Información prescindible

Quiz
•
University
10 questions
Curación de úlceras por presión

Quiz
•
University - Professi...
12 questions
CA M02 SUB 2

Quiz
•
University
Popular Resources on Wayground
25 questions
Equations of Circles

Quiz
•
10th - 11th Grade
30 questions
Week 5 Memory Builder 1 (Multiplication and Division Facts)

Quiz
•
9th Grade
33 questions
Unit 3 Summative - Summer School: Immune System

Quiz
•
10th Grade
10 questions
Writing and Identifying Ratios Practice

Quiz
•
5th - 6th Grade
36 questions
Prime and Composite Numbers

Quiz
•
5th Grade
14 questions
Exterior and Interior angles of Polygons

Quiz
•
8th Grade
37 questions
Camp Re-cap Week 1 (no regression)

Quiz
•
9th - 12th Grade
46 questions
Biology Semester 1 Review

Quiz
•
10th Grade