1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Parties involved during the construction except

Supplier

Authorities

FInancial company

Jabatan Kerja Raya

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Role of contractor are ;

i) To built and complete the construction based on contract.

ii) To comply with the local authorities regulation.

iii) Own and finance the project.

iv) to bear all the carried out and completed work at the site.

i, ii and iii

i, ii and iv

i and iv

iii and iv

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Local authorities during construction are....

i) Tenaga Nasional Berhad

ii) Telekom Malaysia

iii) Jabatan Bomba & Penyelamat

iv) Indah Water Konsortium

ii, iii dan iv

i, ii, iii and iv

i and iii

i and iv

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Role of Jabatan Kerja Raya are..

i) Provide guidance on construction technology advice

ii) Provide technical advice to the government at the state, state and district levels

iii) Examine and test the completed fire prevention system.

iv) Ensure clients comply with EIA orders.

i dan ii

i and iii

i and iv

iii and iv

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Characteristic of construction management are ....

i) Complex and it involves a number of individuals from different departments.

ii) Unique and cannot be replicated.

iii) Consists of a number of associated activities

iv) Satisfy the owners requirement and expectations from the project.

i and ii

i and iii

ii, iii and iv

i,ii, iii and iv

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The major differences between  projects and operations are:

Projects are ongoing and operations are short

Projects should always be done by engineers and operations may be performed by technicians

Projects and operations are the same thing but projects always costs more to implement

Projects are temporary and operations are ongoing

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

How are project costs calculated?

By adding up the costs of all materials

By adding human resources (staff hours times billing rates), plus the marked-up costs of material resources

By a calculation so complicated only a computer could do it

By multiplying the human resources by the material resources

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?