1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
48.Which of the following processes is included in Project Integration Management?
A. Develop project management plan.
B. Control scope definition.
C. Review scope validation.
D. Conduct procurement surveillance.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
49. All of the following are characteristics of the project charter EXCEPT :
A. It formally authorizes the existence of a project.
B. Projects are initiated by an entity external to the project. The project initiator or sponsor should be at the level that is appropriate to procure funding and commit resources to the project.
C. It is used primarily to request bids for a project or a specific phase of a project.
D. It provides the project manager with the authority to apply organizational resources to project activities.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
50.All of the following are characteristics of the Project Management Information System (PMIS) EXCEPT :
A. Automated gathering and reporting on key performance indicators (KPIs) can be part of this system.
B. It provides access to information technology (IT) software tools, such as scheduling soft ware tools, work authorization systems, and configuration management systems.
C. It is used as part of the Direct and Manage Project Work.
D. It is used by the project manager and the project management team primarily to generate presentations to key stakeholders.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
51.Which of the following is NOT true about tools and techniques of Perform Integrated Change Control?
A. They include expert judgment.
B. They include change control meetings.
C. A change control board (CCB) is responsible for meeting and reviewing the change requests and approving, rejecting, or other disposition of those changes.
D. They include project plan updates.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
52. You are managing a $10 million project . Which of the following is an acceptable cause for "re-baselining" this project?
A. The client has approved an addition to the scope of the project with a $150,000 budget increase and a two-week extension of the scheduled completion.
B. The contractor’s company has instituted a quality assurance program in which it has pledged to spend $1 million during the next year.
C. The productivity in the design department is lower than estimated, which has resulted in1,000 additional hours over what was budgeted and a forecasted two-week delay of the scheduled completion.
D. The engineering department of the performing organization has converted to a new $250,000 CAD system.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
53. Configuration management is focused on :
A. The identification and correction of problems arising in functional areas of project implementation.
B. The specification of both the deliverables and the processes, while change control is focused on identifying, documenting, and approving or rejecting changes to the project documents, deliverables, or baselines.
C. Testing new systems.
D. Identifying, documenting, and controlling changes to the project and the product baselines, while change control is focused on the specifications of both the deliverables and the processes .
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
53. A change control board (CCB) is
A.A formally chartered group of stakeholders responsible for ensuring that only a minimal amount of changes occurs on the project.
B.A formal or an informal group of stakeholders that has oversight of project execution.
C.A formally chartered group responsible for reviewing, evaluating, approving, delaying, or rejecting changes to the project, and for recording and communicating such decisions.
D.A dashboard that provides integrated information to help control changes to cost, schedule, and specifications throughout the life of the project
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?
Similar Resources on Wayground
20 questions
Group 4. Phenomenology
Quiz
•
University
15 questions
English Language Teaching (ELT) Pedagogy and Materials
Quiz
•
University
15 questions
GE 2 QUIZ 1.2 (WICE; Branches of Ethics)
Quiz
•
University
20 questions
POE CT1 Quiz
Quiz
•
University
18 questions
Moksha part 3
Quiz
•
9th Grade - University
16 questions
N5 validity
Quiz
•
University
15 questions
Taoism
Quiz
•
University
20 questions
Advaita Vedanta
Quiz
•
1st Grade - University
Popular Resources on Wayground
5 questions
This is not a...winter edition (Drawing game)
Quiz
•
1st - 5th Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
10 questions
Identify Iconic Christmas Movie Scenes
Interactive video
•
6th - 10th Grade
20 questions
Christmas Trivia
Quiz
•
6th - 8th Grade
18 questions
Kids Christmas Trivia
Quiz
•
KG - 5th Grade
11 questions
How well do you know your Christmas Characters?
Lesson
•
3rd Grade
14 questions
Christmas Trivia
Quiz
•
5th Grade
20 questions
How the Grinch Stole Christmas
Quiz
•
5th Grade
Discover more resources for Philosophy
26 questions
Christmas Movie Trivia
Lesson
•
8th Grade - Professio...
20 questions
christmas songs
Quiz
•
KG - University
20 questions
Holiday Trivia
Quiz
•
9th Grade - University
15 questions
Holiday Movies
Quiz
•
University
14 questions
Christmas Trivia
Quiz
•
3rd Grade - University
20 questions
Christmas Trivia
Quiz
•
University
8 questions
5th, Unit 4, Lesson 8
Lesson
•
KG - Professional Dev...
20 questions
Disney Trivia
Quiz
•
University