18th Edition Part 4 Mock 3

18th Edition Part 4 Mock 3

Professional Development

10 Qs

quiz-placeholder

Similar activities

Jesús

Jesús

Professional Development

10 Qs

Planeación de la  Calidad

Planeación de la Calidad

Professional Development

10 Qs

USO DE LA FUERZA

USO DE LA FUERZA

Professional Development

10 Qs

TEMA 8: PANADERÍA Y PASTELERÍA

TEMA 8: PANADERÍA Y PASTELERÍA

Professional Development

14 Qs

Women Achievers

Women Achievers

Professional Development

10 Qs

electronica basica 1

electronica basica 1

University - Professional Development

10 Qs

QUIZ 1 - RIZAL

QUIZ 1 - RIZAL

KG - Professional Development

10 Qs

MEDICAMENTOS ESENCIALES

MEDICAMENTOS ESENCIALES

Professional Development

10 Qs

18th Edition Part 4 Mock 3

18th Edition Part 4 Mock 3

Assessment

Quiz

Other

Professional Development

Practice Problem

Hard

Created by

Gareth Wyatt

Used 4+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

In an electrical substation supplying an IT system, the power frequency stress voltages, with RE and RA interconnected and an existing earth fault in the installation, the value of U1 is equal to?

a)       Uo
b)           Uo x 3
c)             RA x Id
d)       RAXIE+Uox 3

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Which of these is not an example of an extraneous-conductive part?

a)       Central heating radiator
b)       Gas installation pipe
c)        Air conditioning duct
d)       PVC conduit system

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Which of the following would allow the omission of fault protection?

a)       Unearthed street furniture supplied from an overhead line and inaccessible in normal use
b)        Large exposed conductive parts
c)        Concrete poles where the steel reinforcement is above the surface
d)        A non-conducting location under skilled supervision

4.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

In a TN system connected to the public supply, who is responsible for the integrity of a PEN conductors' connection to earth, external to the installation?

a)    The installer
b)     A skilled competent person
c)     The inspector
d)    The distributor

5.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

What is the maximum earth fault loop impedance Zs for a 13A, BS 1362 fuse to ensure a 0.4s disconnection time?

a) 23.2 Q
b) 3.83 Q
c) 16.4 Q
d) 2.3 Q

6.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Q14) In locations where BE2 conditions exist and, unless otherwise recommended by equipment manufacturers, what is the maximum rating of a projector lamp that is positioned 0.8 m from combustible material?

a)         100 W
b)        200 W
c)         300 W
d)         400 W

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Which of the following is an example of an extraneous-conductive part?

a)        Metal water installation pipe
b)        Non-metallic water pipe in a bathroom
c)        Metallic girder work totally embedded in the fabric of the building
d)        Polyvinyl chloride (PVC) conduit system

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?