Uji petik power system

Uji petik power system

10th Grade

100 Qs

quiz-placeholder

Similar activities

PAT GENAP KELAS X TAHUN 2025

PAT GENAP KELAS X TAHUN 2025

10th Grade

100 Qs

ASAS 1 MATEMATIKA KLS 9

ASAS 1 MATEMATIKA KLS 9

9th Grade - University

101 Qs

PH 1 IPA

PH 1 IPA

9th - 12th Grade

100 Qs

Latihan Soal 1

Latihan Soal 1

10th Grade

100 Qs

coba sekali pasti ketagihan

coba sekali pasti ketagihan

10th Grade

100 Qs

UAS Klimatologi Dasar

UAS Klimatologi Dasar

9th Grade - University

105 Qs

Remidi Akbar Semester 2

Remidi Akbar Semester 2

10th Grade

100 Qs

QUIZZ AIJ XII - Latihan PTS Semester Ganjil 2020

QUIZZ AIJ XII - Latihan PTS Semester Ganjil 2020

KG - Professional Development

100 Qs

Uji petik power system

Uji petik power system

Assessment

Quiz

Computers, Mathematics, Science

10th Grade

Easy

Created by

Ananta Widia sasmita

Used 4+ times

FREE Resource

100 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Berapakah refrensi jarak platina main contact diukur dari Rod posisi close (W2) pada HSCB Secheron ?

3 ± 1 W2 8 ± 0,5 mm

3 ± 1 W2 8 ± 2 mm

3 ± 0,5 ≤ W2 ≤ 8 ± 1 mm

3 ± 1 W2 8 ± 1 mm

2.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Jenis jaringan komunikasi pada sistem LBD adalah

Double Ring

Single Ring

  Point to multipoint

Point to Point

3.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Apakah fungsi dari VLD

Mencegah bahaya tegangan sentuh yang tinggi akibat kebocoran tegangan pada return Circuit

Mencegah ketidakseimbangan tegangan dengan membatasi tegangan lebih pada sisi negatif TPSS

Sebagai tempat kembalinya tegangan pada sisi negatif sistem TPSS

Membatasi lonjakan tegangan pada sisi negatif TPSS untuk mencegah defisit atau rugi-rugi tegangan pada sisi positif (third rail)

4.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Media Image

Pada gambar disamping untuk mengoprasikan perpindahan suplay dari source 1 ke 2 dengan manual yang benar adalah ..

Posisi manual , PB off, lalu On-2

Posisi manual , lalu ON-2

Tekan tombol off, lalu On-2

Posisi Auto, PB off, On -2

5.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Apa saja yang harus diperiksa pada saat melakukan pemeriksaan pada HSCB Secheron

Arching Contact, Main Contact, Temperatur, Pressure

Arching Contact, Main Contact, Counter Trip, Toroid

Arching Contact, Main Contact, Insulator, Lilitan/Coils

Arching Contact, Main Contact, Fuse line test, DS Section

6.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Gangguan teknis sistem distribusi daya dibedakan menjadi, kecuali:

gangguan jaringan distribusi daya.

gangguan di DSS

gangguan pada system persinyalan

gangguan di Gardu Traksi yang mempunyai fasilitas suplai daya distribusi 20kV AC

7.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Saklar pemisah, yang berfungsi sebagai pemutus atau penghubung daya listrik dari satu gardu ke third rail di emplasemen, ataupun pemutus dan penghubung daya listrik antar section gardu, merupakan fungsi peralatan  dari

DS STANDBY

DS SECTION

DS FEEDER

DS NEGATIF

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?