
Q3 TLE 9 : QUIZ #1 - Building Lines
Authored by Marvin Casupanan
Specialty
9th Grade
Used 6+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
15 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
It is an indispensable skill that is always needed and highly in demand worldwide.
Carpentry
Drawing
Singing
Farming
2.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
It is a process that defines the position of the site foundation and outside walls of the building by locating and fixing the reference lines.
Layout
Carpentry
Constructing
Masonry
3.
MULTIPLE SELECT QUESTION
1 min • 1 pt
This is a critical step that needs accuracy to successfully execute the construction plan of a building.
Masonry
Carpentry
Preliminary Layout
Staking Out
4.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
This is used for cutting pegs for stake out.
Crosscut Saw
Chalk Line
Claw Hammer
Bolo
5.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
It is used in cutting the woods that are across the grain.
Bolo
Crosscut Saw
Plumb Bob
Spirit Level
6.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
This is used to pull out a long nail.
Claw Hammer
Wrecking Bar
Steel Square
Water Level Hose
7.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
This is used to measure the horizontal level of two distant points.
Water Level Hose
Spirit Level
Plumb Bob
Lumber
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?