
9626 Chap15 System Life Cycle
Authored by Lucy Bernard
Computers
12th Grade
Used 13+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
15 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
During Evaluation stage, the most important question to be ask the user is .....
whether the new system meets the user requirements
Whether the old system meets the user requirements
Whether they are using the new system ore not
None of the above.
2.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
There are four types of maintenance. There are .....
Perfective, Preventative, Adaptive and Corrective
Parallel, Phase, Pilot and Direct
Beta, Alpha, White box and Black box
Normal, Abnormal, Extreme, Live
3.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
User documentation is a user guide giving instructions to the user. The main part of the user guide is ........
Listing of all the files used in the system and their their purposed identified.
the instructions on how to use the system.
the overview of the structure of the system
None of the above
4.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
In implementation of a new system, there are factors need to be considered in deciding which installation method is best to for the new system. Which of the following is NOT one of the factor
Size of the new system
Number of users in the organization
How critical the system is to the running of the organization.
Cost
The programmers are not prepared.
5.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
One of the disadvantage of this installation method is duplication of data input where additional staffing is needed to enter data. In which installation method is this situation referring to.
Direct
Parallel
Pilot
Phased
6.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
One of the disadvantage of this installation method is that all the staff need to be trained in advance of changeover and this might lead to the users forgetting what they have learned by the time they start to use the new system. In which installation method is this situation referring to.
Parallel
Pilot
Phased
Direct
7.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
In Development and Testing stage, a test plan will identify the following:
What is being tested, The type of test,
The input data that should be used to test it, ............................ and space to record the actual result. Fill in the blank.
The duration of the test
the expected result
Who will enter the data
None (blank)
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?
Similar Resources on Wayground
15 questions
Ôn tập kỳ 2 tin 6
Quiz
•
1st - 12th Grade
11 questions
Cascading Style Sheets
Quiz
•
8th - 12th Grade
20 questions
Online Platform Block Q
Quiz
•
11th - 12th Grade
20 questions
City & Guilds Award in Business Processes
Quiz
•
12th Grade
10 questions
EMPTECH L4 Q2
Quiz
•
12th Grade
10 questions
PRE-ASSESSMENT ETECH M1
Quiz
•
12th Grade
15 questions
emptech L1 A
Quiz
•
12th Grade
10 questions
Working with tables
Quiz
•
5th - 12th Grade
Popular Resources on Wayground
8 questions
Spartan Way - Classroom Responsible
Quiz
•
9th - 12th Grade
15 questions
Fractions on a Number Line
Quiz
•
3rd Grade
14 questions
Boundaries & Healthy Relationships
Lesson
•
6th - 8th Grade
20 questions
Equivalent Fractions
Quiz
•
3rd Grade
3 questions
Integrity and Your Health
Lesson
•
6th - 8th Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
9 questions
FOREST Perception
Lesson
•
KG
20 questions
Main Idea and Details
Quiz
•
5th Grade