3Q-1.01 POST TEST-EC

3Q-1.01 POST TEST-EC

3rd - 8th Grade

7 Qs

quiz-placeholder

Similar activities

ICT 5 week 11

ICT 5 week 11

5th Grade

10 Qs

3rd Quarter Spelling Test 6th Grade

3rd Quarter Spelling Test 6th Grade

6th Grade

10 Qs

Ben 10

Ben 10

1st Grade - University

12 Qs

Hot Air Balloon PRE-TEST

Hot Air Balloon PRE-TEST

6th - 8th Grade

10 Qs

Steven universe Quiz

Steven universe Quiz

KG - Professional Development

10 Qs

Tema 5 sub tema 1 PB 1

Tema 5 sub tema 1 PB 1

6th Grade

12 Qs

Week 2 Science Vocabulary Words

Week 2 Science Vocabulary Words

4th Grade

10 Qs

Chasing Vermeer

Chasing Vermeer

5th Grade

10 Qs

3Q-1.01 POST TEST-EC

3Q-1.01 POST TEST-EC

Assessment

Quiz

Other

3rd - 8th Grade

Medium

Created by

Jacqueline Thompson

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An offer to perform a specified amount of work under certain conditions with cost estimates included.

Bid

Water Tap

Allowances

Table Saw

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Agreements between the owner and contractor to change the requirements, price, schedule or similar term of the contract.

scope change

change order

change agreement

change contract

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

_____________are used to manage start and finish dates, differentiate between critical and non-critical work, plan for slack time, and ensure work schedules don't conflict.

Excel spreadsheets

Gantt charts

Contract

Project planners

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An amount of money allocated in the construction contract for specific items.

Allowance

Reserves

Allocation

Specific Project Funds (SPF)

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Oversees all stages of a large project: estimating costs, drawing plans, getting building permits, and hiring help.

Architect

Project Leader

Designer

Contractor

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Uses their creativity to plan the look and layout of a space, location of furniture, fabric types, and color schemes.

Architect

Project Leader

Designer

Contractor

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The part of your structure that connects the house/building to the ground.

Foundation

Basement

Deck

Septic tank