Lean

Lean

1st Grade - University

14 Qs

quiz-placeholder

Similar activities

KUIS CH TRAINING

KUIS CH TRAINING

1st - 10th Grade

10 Qs

EXAMEN LOGISTICA U1

EXAMEN LOGISTICA U1

4th Grade

15 Qs

Prueba MCF

Prueba MCF

University

10 Qs

test 1 BSPS

test 1 BSPS

University - Professional Development

13 Qs

FQAPU5A001

FQAPU5A001

University

14 Qs

Pak Cecep Games

Pak Cecep Games

11th Grade

14 Qs

KS BP 24 MEI 2022

KS BP 24 MEI 2022

3rd Grade

10 Qs

Shigeo Shingo

Shigeo Shingo

University

15 Qs

Lean

Lean

Assessment

Quiz

Professional Development

1st Grade - University

Hard

Created by

Salem Jerbi

Used 8+ times

FREE Resource

14 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Product layout is generally used for standardized goods.

True

False

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which of the following refers to the term ‘autonomation’?

Poka-yoke

Jidoka

Andon

5S

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

If it takes 20 minutes of net production time to make 10 pieces, what will be the cycle time?

20

0.5

2

Cannot be calculated from this information

Answer explanation

Media Image

Cycle time represents the amount of time it takes to complete one task, production, service, or process from start to finish.

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

An activity that is wasteful and doesn’t add value or is unproductive is called:

Muda

Mura

Murari

Muri

Answer explanation

Muda, which literally translates to waste, refers to anything in the manufacturing process that does not add value from the customer’s perspective.

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is an Andon Board?

Visual control device on production line

Visual control device for inventory control

Visual control using charts such as control charts

Visual control for production plans

Answer explanation

Andon, meaning Light signal. It’s a visual feedback system for the plant floor that is used to call for help when an abnormal condition is recognized, or that some sort of action is required.

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

SMED stands for Single-Minute Exchange of Dies.

True

False

7.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is the target setup time in SMED (Single Minute Exchange of Die)?

No more than of one setup every shift

Maximum of one setup every day

less than ten minutes

less than one minute

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?