The Big Quiz Level 3 8202-35 Plumbing

The Big Quiz Level 3 8202-35 Plumbing

Professional Development

33 Qs

quiz-placeholder

Similar activities

Servsafe Food Manager Practice Test 2021- Part 1

Servsafe Food Manager Practice Test 2021- Part 1

9th Grade - Professional Development

31 Qs

SAFETY, ProdOp,

SAFETY, ProdOp,

Professional Development

30 Qs

Engines Fun

Engines Fun

Professional Development

35 Qs

UPC Chapter 2

UPC Chapter 2

Professional Development

37 Qs

Plumbing Quiz 1

Plumbing Quiz 1

KG - Professional Development

30 Qs

BEST MEKANIK BULANAN

BEST MEKANIK BULANAN

Professional Development

30 Qs

Mts Air Sistem Drilling

Mts Air Sistem Drilling

Professional Development

30 Qs

PK MULTIFLO

PK MULTIFLO

Professional Development

28 Qs

The Big Quiz Level 3 8202-35 Plumbing

The Big Quiz Level 3 8202-35 Plumbing

Assessment

Quiz

Specialty

Professional Development

Medium

Created by

Martin Biron

Used 33+ times

FREE Resource

33 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Why when installing a Hot Water Cylinder would you ensure the plywood board the HWC is mounted on has a hole in the centre?

To ensure expansion of the plywood

To stop the plywood from warping

To ensure any condensation on the underside of the cylinder can escape

To enable inspection of the underside of the cylinder with an inspection camera

Answer explanation

It is important that condensation is not allowed to build up on the underside of the HWC. If it does it will drip onto the wooden base and overtime will rot the base and lead to catastrophic failure of the wooden base. That is the reason a hole must be made before the cylinder is placed on it.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is it imperative to ensure the F&E Cylinder is positioned lower than the Cold Water Storage Cistern?

To ensure there is not one pipe circulation

To ensure contaminated water cannot pass from Primary to Secondary

To ensure the F&E cylinder never vents into the cistern

To ensure the CWSC is bigger than the F&E

Answer explanation

In the event of pinholes forming in the Coil. If the F&E was installed above the CWSC there would be greater pressure in the F&E. So 'Dirty' water from the Primary Circuit would force its was into the Secondary Circuit.

By ensuring the pressure is greater in the CWSC the opposite happen so you are less likely to contaminate if pinholes are on the coil.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What is shown in the image?

Gas Fired Water Cylinder

Unvented Cylinder

Domestic How Water Cylinder

Mains Water Booster Cylinder

Answer explanation

Media Image

To Boost Mains incoming supply.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If a kitchen sink macerator stops working what do you need to do to get it operational?

Isolate the mains Supply, Unblock the grinder chamber

Reconnect supply

Isolate the mains Supply, Unblock the grinder chamber with the supplied key

Reconnect supply

Isolate the mains Supply, Unblock the grinder chamber with the supplied key

Reconnect supply

Press the rest button

Isolate the mains Supply, Unblock the grinder chamber with the supplied key

Press the reset button

Reconnect supply

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When did the Private Water Supplies Regulations come into force?

2008

2009

2014

2021

6.

DRAW QUESTION

3 mins • 1 pt

Draw the symbol for a Single Check Valve.

Media Image

Answer explanation

Media Image

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the risk in a Fluid Category 4 liquid?

No risk to health

Slight risk to health

Moderate risk to health

Significant risk to health

Answer explanation

Media Image

Please make sure you memories all!

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?