Building Laws Preboard 1 of 2

Authored by ALE 2022

Architecture, Professional Development, Design

KG - Professional Development

Used 60+ times

Building Laws Preboard 1 of 2
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

50 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Construction in a building involving changes in the materials used, partitioning, locations/sizes of openings, structural parts, existing utilities, and equipment without increasing the overall area.

Alteration

Renovation

Slum upgrading

Redecoration

Answer explanation

Section 106, Rule 1.

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

The transfer of buildings or portions thereof from an original location to another, either within the same lot or to a different one.

Evacuation

Reassembly

Moving

Disaster displacement

Answer explanation

Section 106, Rule 1.

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Which of the following is NOT true about the building official, according to Rule II of the IRR of PD 1096?

The building official must either be a duly registered architect or civil engineer

The building official must be of good moral character

The building official must have at least five years of diversified and professional experience in building design and construction

All of the above are true

Answer explanation

Section 206, Qualifications.

4.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Which of the following violations is the gravest, according to Rule II of the NBC IRR?

Failure to post Certificate of Occupancy

Use or occupancy of building/structure without appropriate Certificate of Occupancy

Non-compliance with work stoppage order for construction or demolition without permit

Non-compliance with the work stoppage order for the alteration, addition, conversion, or repair without permit

Answer explanation

Section 212. Light, Less Grave, Grave, Less Grave. 5k, 8k, 10k.

5.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Whose duty is it to declare buildings as ruinous or dangerous?

This is the building official’s duty

This is the secretary’s duty

This is the architect’s duty

This is the PRBOA’s duty

Answer explanation

Section 215. Also explicit in Procedure for Abatement/Demolition of Dangerous Buildings.

6.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Which of the following does NOT require a building permit?  

A small patio,only 25 sqm. in area, resting directly on the ground

A low garden masonry wall that is only 6 meters long and only 1.5 meters high

A greenhouse that measures 2 meters x 3 meters only

A mini-aviary measuring 3 meters x 4 meters with a maximum height of less than 6 meters measured from the ground to the apex of the roof

Answer explanation

Section 301 – Exemptions from Building Permits

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

What is the minimum distance required between eaves and the rear and side property lines?

500mm

750mm

1000mm

None of the above. Setbacks are measured not to the eaves, but to the exterior faces of the walls.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?