Drill 023 - Hazmat Decon

Drill 023 - Hazmat Decon

Professional Development

8 Qs

quiz-placeholder

Similar activities

Introduction to WTP Processes

Introduction to WTP Processes

Professional Development

11 Qs

Test Your Phlebotomy Knowledge

Test Your Phlebotomy Knowledge

Professional Development

10 Qs

Terapi Advance

Terapi Advance

Professional Development

8 Qs

CCP & Temperature Control

CCP & Temperature Control

Professional Development

10 Qs

The Entrepreneurs Game

The Entrepreneurs Game

9th Grade - Professional Development

12 Qs

Cold Water Systems LO5

Cold Water Systems LO5

Professional Development

10 Qs

HC-ID01-G-5-4-10-095-0-A post test

HC-ID01-G-5-4-10-095-0-A post test

Professional Development

8 Qs

CBRNE

CBRNE

Professional Development

8 Qs

Drill 023 - Hazmat Decon

Drill 023 - Hazmat Decon

Assessment

Quiz

Professional Development, Science

Professional Development

Hard

Created by

kerry hoey

Used 7+ times

FREE Resource

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which zone does Decontamination take place in?

Hot

Warm

Cold

Staging

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Chemical Decontamination includes:

neutralisation & disinfection

neutralisation & dilution

dilution & disinfection

disinfection & evaporation

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many appliances are required for Mass Decontamination?

1 or 3

4 or 6

2 or 5

2 or 4

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does a yellow tag indicate:

possible asbestos contamination

contaminated & requires specialist cleaning

decontaminated and requires hygiene cleaning

decontaminated and ready for use

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Decontamination of a fine powder or solid is by:

fine spray

copious amounts of water

chemical decontamination

all of the above

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Physical methods of decontamination include:

disinfection & dilution

dilution & washing

brushing & evaporation

B & C

A & C

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Prior to entry into a hot zone what should always be established?

Airline trolley

Technical Decontamination

DEBRiS

Mass Decontamination

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Firefighters in the Decontamination Corridor must be wearing:

the same PPE as those in the hot zone

a level above those in the hot zone

a level below those in the hot zone

Structural PPE inc BA