SPP DOC 203-205

SPP DOC 203-205

1st - 3rd Grade

35 Qs

quiz-placeholder

Similar activities

Term 1 Revision

Term 1 Revision

3rd - 4th Grade

40 Qs

Code of Ethical Conduct

Code of Ethical Conduct

1st - 3rd Grade

35 Qs

Geo Benchmark #2 Review

Geo Benchmark #2 Review

1st Grade - University

34 Qs

dibujitos

dibujitos

3rd Grade

31 Qs

tower defense simulator solar eclipse night 1 enemies

tower defense simulator solar eclipse night 1 enemies

1st Grade

35 Qs

Math

Math

2nd Grade

31 Qs

Learning without tears

Learning without tears

1st - 5th Grade

36 Qs

أسماء الإشارة

أسماء الإشارة

1st Grade

33 Qs

SPP DOC 203-205

SPP DOC 203-205

Assessment

Quiz

Architecture

1st - 3rd Grade

Practice Problem

Medium

Created by

Maria Go

Used 97+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

35 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

As a result of the pandemic, a developer's office building has lost nearly 50% of its tenants. The management hired an architect to come up with schemes to appeal to a different tenant demographic and increase building occupancy. What service is the architect rendering?

A specialized allied service

A specialized architectural service

A post-construction service

Both C and D

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

All of the following are part of the scope of the full-time supervision service except for:

Quality Control

Evaluation of construction work

Preparation of daily inspection reports

Cost and time control

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

SPP Document 205 contains the standards for:

Specialized allied services

Regular design services

Post-construction services

Specialized architectural services

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

 

SPP Document 203 contains the standards for:

Specialized allied services

Regular design services

Post-design services

Specialized architectural services

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The construction management service is covered by which SPP Document?

SPP 202

SPP 204a

SPP 204b

Both B and C

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The detailed planning and design to control sound transmission for compatibility with the architectural design concept is

Predesign service

Post-construction service

A specialized allied service

A specialized architectural services

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Business development or business management includes billing the tenants for rentals and utilities (electricity, water, telephone, cable, gas and other/ related dues). Which SPP Document covers this service?

SPP DOC 203

SPP DOC 205

SPP DOC 204b

SPP DOC 204a

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?