SPP DOC 203-205

SPP DOC 203-205

1st - 3rd Grade

35 Qs

quiz-placeholder

Similar activities

PP412 - 4A

PP412 - 4A

1st - 3rd Grade

30 Qs

quiz

quiz

1st - 12th Grade

31 Qs

FortiAuthenticator 6.1

FortiAuthenticator 6.1

2nd Grade

31 Qs

Vocational Aptitude Third Grade

Vocational Aptitude Third Grade

3rd Grade

40 Qs

L3333

L3333

3rd Grade

30 Qs

PPQuiz_Monuments and Architecture_16Oct21

PPQuiz_Monuments and Architecture_16Oct21

3rd - 8th Grade

30 Qs

TOA - HUMAN SETTLEMENTS

TOA - HUMAN SETTLEMENTS

1st - 3rd Grade

40 Qs

Annex A & SPP Docs 201-202

Annex A & SPP Docs 201-202

1st - 3rd Grade

35 Qs

SPP DOC 203-205

SPP DOC 203-205

Assessment

Quiz

Architecture

1st - 3rd Grade

Medium

Created by

Maria Go

Used 94+ times

FREE Resource

35 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

As a result of the pandemic, a developer's office building has lost nearly 50% of its tenants. The management hired an architect to come up with schemes to appeal to a different tenant demographic and increase building occupancy. What service is the architect rendering?

A specialized allied service

A specialized architectural service

A post-construction service

Both C and D

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

All of the following are part of the scope of the full-time supervision service except for:

Quality Control

Evaluation of construction work

Preparation of daily inspection reports

Cost and time control

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

SPP Document 205 contains the standards for:

Specialized allied services

Regular design services

Post-construction services

Specialized architectural services

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

 

SPP Document 203 contains the standards for:

Specialized allied services

Regular design services

Post-design services

Specialized architectural services

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The construction management service is covered by which SPP Document?

SPP 202

SPP 204a

SPP 204b

Both B and C

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The detailed planning and design to control sound transmission for compatibility with the architectural design concept is

Predesign service

Post-construction service

A specialized allied service

A specialized architectural services

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Business development or business management includes billing the tenants for rentals and utilities (electricity, water, telephone, cable, gas and other/ related dues). Which SPP Document covers this service?

SPP DOC 203

SPP DOC 205

SPP DOC 204b

SPP DOC 204a

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?